FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
5 Installing the Cabinet
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
66
When laying out the marking-off template, verify that the cabinet front door faces a cold
aisle or outside of the module in the case of a hot aisle.
If there is no need to secure the cabinet to the floor, mark only the outline of the marking-
off template.
Figure 5-4
Using a laser locator for positioning
(1) Marking-off template
(2) Contained aisle
(3) Laser locator
Step 4
Use a measuring tape to measure the aisle distance and mark the position for the end cabinet
in the other row in the same way.
Step 5
(Optional) Drill holes into the marked hole positions and install expansion bolts.
The M12 expansion bolts should be supplied by the customer. The M12 bolt must be at least 80 mm
long for a 2000 mm high cabinet.
----End
5.3 Installing Cabinets (Without Bases)
Procedure
Step 1
Place end cabinets in the marked positions, as shown in