Figure 9-6
Placing the VCN500
Step 3
Tighten the captive screws in the ears using a Phillips screwdriver, and close the mounting ear
buttons, as shown in
Figure 9-7
Installing the VCN500
Step 4
Connect the VCN500 power cable to the PDU2000.
----End
9.4 (Optional) Installing a LAN Switch
Procedure
Step 1
Determine the mounting holes for the LAN switch based on the network cabinet device
layout, adjust the guide rails, and install floating nuts.