FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
4 Hardware Installation Preparations
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
29
When deploying the base, place the side marked FRONT facing upwards.
After deploying the base, check that the adjustable feet for the base should be installed at
the front door of the air conditioner.
Figure 4-12
300 mm wide fixed base
Procedure
Step 1
Adjust the adjustable feet for the base.
1.
Remove the four M6 screws from the support to split the adjustable feet from the base,
as shown in
Figure 4-13
Removing adjustable feet
2.
Move the adjustable feet to the mounting holes on the base according to the depth of the
air conditioner.