Circuit O2 cell replacement
Handle and dispose of O2 cells according to site
biohazard policies. Do not incinerate.
It may take a new O2 cell 90 minutes to stabilize. If the O2 cell
calibration fails after a new O2 cell had been installed, wait 90
minutes and repeat the calibration.
1.
Pull the latch to unlock the flow sensor module from the
breathing system.
AB.74p052
2.
Pull the flow sensor module from the breathing system.
3.
Remove the O2 cell cable connector from the O2 cell and
unscrew the cell counterclockwise.
AB.74p065
4.
Make sure the o-ring is on the cell. Install the replacement O2
cell. Reconnect the O2 cell cable.
AB.74p083
5.
Replace the flow sensor module on the system and push the
latch closed to secure the module.
6.
Calibrate the new O2 cell according to the "
"
procedure.
WARNING
Note
9 User maintenance
2067226-001
9-5
Содержание auisys cs2
Страница 1: ...Aisys CS User s Reference Manual Software Revision 10 X ...
Страница 25: ...Abbreviation Definition VCV Volume control ventilation Vol Volume 1 Introduction 2067226 001 1 13 ...
Страница 32: ...1 20 2067226 001 ...
Страница 60: ...3 Set the alarm limits to clinically appropriate settings Aisys CS 3 12 2067226 001 ...
Страница 87: ...3 Push the drain button to empty any water in the condenser 3 Operation 2067226 001 3 39 ...
Страница 90: ...3 42 2067226 001 ...
Страница 94: ...4 4 2067226 001 ...
Страница 132: ...7 20 2067226 001 ...
Страница 149: ...2 Auxiliary O2 flow control Figure 8 5 Auxiliary O2 flowmeter 8 Setup and connections 2067226 001 8 17 ...
Страница 164: ...9 8 2067226 001 ...
Страница 178: ...System pneumatic circuit AB 75 270 Aisys CS 11 2 2067226 001 ...
Страница 230: ...4 Select Back to return to the Gas Usage menu Aisys CS 12 4 2067226 001 ...
Страница 262: ...13 20 2067226 001 ...
Страница 268: ...Aisys CS User s Reference Manual English 2067226 001 06 13 C 18 05 02 Printed in USA ...