
31
Basic Operation
7-2.
How to load fiber holder to FSM-100M+/P+
(1)
Open the wind protector.
(2)
Open the LED unit lid.
(3)
Loosen the fixing screw of Z-slide unit and move them back when LDF is
loaded.
Move Z-slide unit back as much
as possible when LDF is spliced.
Open/Close LED unit lid
How to load LDF to FSM-100M+ /P+
•When the cladding diameter of the fiberis over 250um, adjust z-slide
holder. Allow as much distance as possible between fiber holder and
v-groove. This is to reduce fiber angle at splice point, which may increase
splice loss.
• Z-Slide is fixed to the position [10] of the scale with the screw when
shipping.
This “Locking function” is used for transportation. When you
move the Z-slide unit the first time after the splicer is delivered, you need
to loosen the fixing screw enough and release the “Locking function”.
Содержание FSM-100M
Страница 2: ...FSM 100M P series FSM 100M P series ...