Proline t-mass I 300 HART
Installation
Hauser
29
3.
NOTICE
Damage to the sensing element!
‣
Make sure the sensing elements do not hit against anything.
Using a wrench (27 mm / 35 mm / 41 mm), tighten the bottom nut of the
compression fitting to the end stop.
27 mm / 35 mm / 41 mm
A0036810
4. Now read off the previously calculated insertion depth from the scale and insert the
sensor until this value is at the same height as the upper end of the compression
fitting.
5. Tighten the union nut by hand. It should still be possible to move the sensor slightly.
A0041024
6. Align the sensor with the flow direction.
Pay attention to the direction of the arrow on the neck section of the sensor for
the flow direction.
The maximum permitted deviation from the flow direction is 3°.
90°(±3°)
90°(±3°)
!31,0 ±0,5
(1.22 ±0.019)
90°(±3°)
A0039511
16
Engineering unit: mm (in)
7.
Depending on the process connection:
Tighten union nut with x turns:
For PEEK ferrules continue with Step 8.
For metal ferrules continue with Step 9.
Содержание HART Proline t-mass I 300
Страница 201: ......
Страница 202: ...www addresses endress com 71528699 71528699 ...