![Daikin RXL25G2V1B Скачать руководство пользователя страница 64](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970064.webp)
System Configuration
SiENBE04-925_A
50
Operation Manual
1. System Configuration
After the installation and test operation of the room air conditioner have been completed, it
should be operated and handled as described below. Every user would like to know the correct
method of operation of the room air conditioner, to check if it is capable of cooling (or heating)
well, and to know a clever method of using it.
In order to meet this expectation of the users, giving sufficient explanations taking enough time
can be said to reduce about 80% of the requests for servicing. However good the installation
work is and however good the functions are, the customer may blame either the room air
conditioner or its installation work because of improper handling. The installation work and
handing over of the unit can only be considered to have been completed when its handling has
been explained to the user without using technical terms but giving full knowledge of the
equipment.
SIENBE04-925_A_FRONT.pdf 64
24/02/2011 13:53:53
Содержание RXL25G2V1B
Страница 8: ...SiENBE04 925_A vi Table of Contents ...
Страница 14: ...Introduction SiENBE04 925_A xii ...
Страница 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Страница 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Страница 20: ...Specifications SiENBE04 925_A 6 Specifications ...
Страница 186: ...SiENBE04 925_A Outdoor Unit RXL20G2V1B Removal Procedure 171 4 Feature of the thermistors Step Procedure Points R9356 ...