![Daikin RXL25G2V1B Скачать руководство пользователя страница 171](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970171.webp)
Outdoor Unit - RXL20G2V1B
SiENBE04-925_A
156
Removal Procedure
2. Outdoor Unit - RXL20G2V1B
2.1
Removal of Outer Panels / Fan Motor
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
1. Appearance features
Take care not to cut your
finger by the fins of the
outdoor heat exchanger.
2. Remove the panels.
The stop valve cover is
united with the shield plate.
When reassembling, make
sure to fit the 5 hooks.
1
Remove the screw of
the stop valve cover.
Pull down the stop
valve cover and remove
it.
DAIKIN
INVERTER
(R7186)
(R7188)
Stop
valve
cover
SIENBE04-925_A_FRONT.pdf 171
24/02/2011 13:54:04
Содержание RXL25G2V1B
Страница 8: ...SiENBE04 925_A vi Table of Contents ...
Страница 14: ...Introduction SiENBE04 925_A xii ...
Страница 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Страница 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Страница 20: ...Specifications SiENBE04 925_A 6 Specifications ...
Страница 186: ...SiENBE04 925_A Outdoor Unit RXL20G2V1B Removal Procedure 171 4 Feature of the thermistors Step Procedure Points R9356 ...