![Daikin RXL25G2V1B Скачать руководство пользователя страница 283](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970283.webp)
Field Settings
SiENBE04-925_A
268
Trial Operation and Field Settings
2. Field Settings
2.1
When 2 Units are Installed in 1 Room
When 2 indoor units are installed in 1 room, 1 of the 2 pairs of indoor unit and infrared remote
control can be set for different address.
Both the indoor unit PCB and the infrared remote control need alteration.
Indoor Unit PCB
(1) Remove the front grille. (2 screws)
(2) Remove the electrical box. (1 screw)
(3) Remove the shield plate. (4 hooks)
(4) Cut the address setting jumper JA on the control PCB.
Infrared Remote
Control
(1) Remove the cover and take it off.
(2) Cut the address setting jumper J4.
ADDRESS
JA
ADDRESS
JA
EXIST
1
CUT
2
(R12216)
J4
ADDRESS
EXIST
1
CUT
2
J4
(R12235)
SIENBE04-925_A_FRONT.pdf 283
24/02/2011 13:54:20
Содержание RXL25G2V1B
Страница 8: ...SiENBE04 925_A vi Table of Contents ...
Страница 14: ...Introduction SiENBE04 925_A xii ...
Страница 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Страница 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Страница 20: ...Specifications SiENBE04 925_A 6 Specifications ...
Страница 186: ...SiENBE04 925_A Outdoor Unit RXL20G2V1B Removal Procedure 171 4 Feature of the thermistors Step Procedure Points R9356 ...