![Daikin RXL25G2V1B Скачать руководство пользователя страница 185](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970185.webp)
Outdoor Unit - RXL20G2V1B
SiENBE04-925_A
170
Removal Procedure
2.4
Removal of Thermistors
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Release the discharge
pipe thermistor.
Be careful not to lose the clip
for the thermistor.
2
Cut the clamp.
3
Pull out the outdoor
heat exchanger
thermistor.
Be careful not to lose the clip
for the thermistor.
(R0267)
Discharge pipe thermistor
(R12279)
Clip
(R7221)
(R7222)
Outdoor heat exchanger
thermistor
Clip
SIENBE04-925_A_FRONT.pdf 185
24/02/2011 13:54:06
Содержание RXL25G2V1B
Страница 8: ...SiENBE04 925_A vi Table of Contents ...
Страница 14: ...Introduction SiENBE04 925_A xii ...
Страница 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Страница 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Страница 20: ...Specifications SiENBE04 925_A 6 Specifications ...
Страница 186: ...SiENBE04 925_A Outdoor Unit RXL20G2V1B Removal Procedure 171 4 Feature of the thermistors Step Procedure Points R9356 ...