![Daikin RXL25G2V1B Скачать руководство пользователя страница 269](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970269.webp)
Outdoor Unit - RXL35G2V1B
SiENBE04-925_A
254
Removal Procedure
5.4
Removal of PCB
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
1
Remove the cover of
the electrical box.
Preparation
Remove the electrical box
according to the “Removal of
Electrical Box”.
2
Disconnect the
connectors from the
service monitor PCB
[S52] [S102].
3
Detach the 4 clamps
with pliers.
4
Remove the screws of
the terminal board and
the earth wire.
(R9405)
(R5280)
Service monitor PCB
[S52]
[S102]
Clamps
(R5281)
(R12285)
Terminal board
Earth wire
SIENBE04-925_A_FRONT.pdf 269
24/02/2011 13:54:18
Содержание RXL25G2V1B
Страница 8: ...SiENBE04 925_A vi Table of Contents ...
Страница 14: ...Introduction SiENBE04 925_A xii ...
Страница 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Страница 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Страница 20: ...Specifications SiENBE04 925_A 6 Specifications ...
Страница 186: ...SiENBE04 925_A Outdoor Unit RXL20G2V1B Removal Procedure 171 4 Feature of the thermistors Step Procedure Points R9356 ...