![Daikin RXL25G2V1B Скачать руководство пользователя страница 263](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970263.webp)
Outdoor Unit - RXL35G2V1B
SiENBE04-925_A
248
Removal Procedure
5.3
Removal of Electrical Box
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
1
Remove the 2 screws
of the shield plate.
Preparation
Remove the top panel and
the front panel according to
the “Removal of Outer
Panels”.
2
Slide the shield plate
upward to unfasten the
1 hook on the bottom
left, and then remove
the shield plate.
3
Disconnect the 2 power
supply cables and the 1
earth wire.
(R9388)
Shield
plate
(R9389)
(R9390)
SIENBE04-925_A_FRONT.pdf 263
24/02/2011 13:54:18
Содержание RXL25G2V1B
Страница 8: ...SiENBE04 925_A vi Table of Contents ...
Страница 14: ...Introduction SiENBE04 925_A xii ...
Страница 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Страница 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Страница 20: ...Specifications SiENBE04 925_A 6 Specifications ...
Страница 186: ...SiENBE04 925_A Outdoor Unit RXL20G2V1B Removal Procedure 171 4 Feature of the thermistors Step Procedure Points R9356 ...