![Daikin RXL25G2V1B Скачать руководство пользователя страница 57](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970057.webp)
SiENBE04-925_A
Control Specification
Function and Control
43
3.10 Defrost Control
Outline
Defrosting is carried out by the cooling cycle (reverse cycle). The defrosting time or outdoor
heat exchanger temperature must be more than a certain value to finish.
Detail
Conditions for Starting Defrost
The starting conditions is determined with the outdoor temperature and the outdoor heat
exchanger temperature.
The system is in heating operation.
The compressor operates for 6 minutes.
More than
minutes of accumulated time pass since the start of the operation, or ending
the previous defrosting.
Conditions for Canceling Defrost
The judgment is made with outdoor heat exchanger temperature. (4°C ~ 18°C)
20 class
25 class
35 class
(minutes)
28
30
44
(Hz)
76
48
55
(Hz)
86
70
90
(seconds)
50
60
60
(seconds)
60
120
120
(seconds)
600
650
460
(seconds)
60
30
30
(pulse)
450
450
450
(pulse)
350
350
450
(pulse)
450
450
450
Frequency
Compressor
Four way valve
Fan
ON
OFF
ON
OFF
ON
OFF
0Hz
Hz
Hz
5 sec.
pulse
pulse
pulse
Initial opening
PI control
5 sec.
sec.
(R12211)
Electronic expansion
valve opening
sec.
sec.
sec.
SIENBE04-925_A_FRONT.pdf 57
24/02/2011 13:53:52
Содержание RXL25G2V1B
Страница 8: ...SiENBE04 925_A vi Table of Contents ...
Страница 14: ...Introduction SiENBE04 925_A xii ...
Страница 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Страница 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Страница 20: ...Specifications SiENBE04 925_A 6 Specifications ...
Страница 186: ...SiENBE04 925_A Outdoor Unit RXL20G2V1B Removal Procedure 171 4 Feature of the thermistors Step Procedure Points R9356 ...