![Daikin RXL25G2V1B Скачать руководство пользователя страница 156](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970156.webp)
SiENBE04-925_A
Indoor Unit
Removal Procedure
141
1.6
Removal of PCB
Procedure
Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Remove the shield plate.
1
The figure shows the
appearance of the
electrical box.
Preparation
Remove the electrical box
according to the “Removal
of Electrical Box”.
2
Unfasten the hooks at
the upper 2 positions of
the shield plate.
3
Unfasten the hook at
the side of the shield
plate.
4
Lift up the shield plate
to unfasten the lower
hooks and remove it.
2. Remove the terminal
board.
1
Remove the screw to
remove the terminal
board.
(R8083)
Signal receiver PCB
Control PCB
Shield plate
INTELLIGENT EYE
sensor PCB
(R8085)
Hook
Hook
(R10619)
Shield plate
Hook (side)
Hook (lower)
(R10315)
Terminal board
SIENBE04-925_A_FRONT.pdf 156
24/02/2011 13:54:00
Содержание RXL25G2V1B
Страница 8: ...SiENBE04 925_A vi Table of Contents ...
Страница 14: ...Introduction SiENBE04 925_A xii ...
Страница 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Страница 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Страница 20: ...Specifications SiENBE04 925_A 6 Specifications ...
Страница 186: ...SiENBE04 925_A Outdoor Unit RXL20G2V1B Removal Procedure 171 4 Feature of the thermistors Step Procedure Points R9356 ...