![Daikin RXL25G2V1B Скачать руководство пользователя страница 236](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970236.webp)
SiENBE04-925_A
Outdoor Unit - RXL25G2V1B
Removal Procedure
221
4.3
Removal of PCB
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove the screw and
remove the electrical
box cover.
Preparation
Remove the panels
according to the “Removal of
Outer Panels”.
Remove the electrical box
according to the “Removal of
Electrical Box”.
2
Detach the insulation
sheet.
The trimmed part goes front.
3
Remove the 2 screws
of the earth terminals.
(R12274)
Electrical box cover
(R8156)
(R8157)
Insulation
sheet
Earth
terminals
(R8158)
SIENBE04-925_A_FRONT.pdf 236
24/02/2011 13:54:14
Содержание RXL25G2V1B
Страница 8: ...SiENBE04 925_A vi Table of Contents ...
Страница 14: ...Introduction SiENBE04 925_A xii ...
Страница 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Страница 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Страница 20: ...Specifications SiENBE04 925_A 6 Specifications ...
Страница 186: ...SiENBE04 925_A Outdoor Unit RXL20G2V1B Removal Procedure 171 4 Feature of the thermistors Step Procedure Points R9356 ...