![Daikin RXL25G2V1B Скачать руководство пользователя страница 243](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970243.webp)
Outdoor Unit - RXL25G2V1B
SiENBE04-925_A
228
Removal Procedure
4.5
Removal of Sound Blanket
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Remove the partition
plate.
When reassembling, fit the
lower hook into the bottom
frame.
1
Remove the 2 screws.
2
The partition plate has
hooks on the lower
side. Lift and pull the
partition plate to
remove.
(R12282)
Partition plate
(R8174)
(R8175)
Remove the screw to remove
the reactor.
SIENBE04-925_A_FRONT.pdf 243
24/02/2011 13:54:15
Содержание RXL25G2V1B
Страница 8: ...SiENBE04 925_A vi Table of Contents ...
Страница 14: ...Introduction SiENBE04 925_A xii ...
Страница 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Страница 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Страница 20: ...Specifications SiENBE04 925_A 6 Specifications ...
Страница 186: ...SiENBE04 925_A Outdoor Unit RXL20G2V1B Removal Procedure 171 4 Feature of the thermistors Step Procedure Points R9356 ...