![Daikin RXL25G2V1B Скачать руководство пользователя страница 159](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970159.webp)
Indoor Unit
SiENBE04-925_A
144
Removal Procedure
6. Remove the display PCB.
The display PCB is
positioned on the rear side
of the signal receiver unit.
1
The figure shows the
connection of wire
harness for the display
PCB.
2
Unfasten the 4 hooks
and remove the display
PCB.
3
Disconnect the
connector [S49] from
the display PCB.
7. Remove the control PCB.
1
Unfasten the lower 2
hooks of the control
PCB.
Step
Procedure
Points
(R8094)
Display PCB
(R10318)
Hook
(R8096)
LED 3 (Green)
LED 1 (Green)
[S49]
LED 2 (Yellow)
(R8097)
Hook
Control PCB
SIENBE04-925_A_FRONT.pdf 159
24/02/2011 13:54:00
Содержание RXL25G2V1B
Страница 8: ...SiENBE04 925_A vi Table of Contents ...
Страница 14: ...Introduction SiENBE04 925_A xii ...
Страница 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Страница 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Страница 20: ...Specifications SiENBE04 925_A 6 Specifications ...
Страница 186: ...SiENBE04 925_A Outdoor Unit RXL20G2V1B Removal Procedure 171 4 Feature of the thermistors Step Procedure Points R9356 ...