Branch Provider (BP) Unit Control
SiUS181305E
57
Function
6. Branch Provider (BP) Unit Control
6.1
Branch Provider (BP) Unit Command Conversion
1.
D (room thermistor temperature
target temperature) signals from BP units are
converted to a capacity up / down signal.
D signals from BP units are used as the capacity up / down signal in frequency commands
(excludes during POWERFUL operation).
2. Processing during POWERFUL operation
(1) When POWERFUL command is received from one or more indoor units.
(2) Thermostats are not OFF at the indoor units from which POWERFUL commands are issued
When the above conditions are met, the POWERFUL operation is activated, and the
POWERFUL operation signal is sent to the outdoor unit.
D Signal
Capacity up / down signal
0
Thermostat OFF
1
Down
2
3
Keep
4
5
Up
6
7
8
9
A
B
C
D
E
F
Содержание RMXS-L Series
Страница 10: ...Safety Considerations Safety Considerations ix...
Страница 11: ...SiUS181305E 1 List of Functions Part 1 List of Functions 1 Functions 2 1 1 Outdoor Unit 2 1 2 Indoor Unit 3...
Страница 129: ...SiUS181305E Field Settings Test Operation and Field Settings 120...
Страница 144: ...FFQ09 12 15 18LVJU SiUS181305E 135 Remote Controller...
Страница 249: ...SiUS181305E Removal Procedure Booklet No Appendix 240...