Test Operation
SiUS181305E
95
Test Operation and Field Settings
BRC7E830
How to check airflow direction
8
Push the
Menu/OK
button to enter the
Main
Menu
.
9
Use the
buttons to select
Airflow
Direction
and push the
Menu/OK
button.
10
Check that the airflow direction is actuated
according to the setting and push the
Menu/OK
button.
How to deactivate test operation
11
Press and hold the
Cancel
button for 4
seconds to enter the
Service Settings
menu.
12
Use the
buttons to select
Test Operation
in the menu and push the
Menu/OK
button.
Step
Action
Remote controller
(R18829)
(R18830)
(R18827)
Step
Action
1
Turn on the power supply more than 6 hours before test operation.
2
Open the gas stop valve.
3
Open the liquid stop valve.
4
Set to cooling operation with the remote controller and start operation by pressing
ON/OFF
button.
5
Press the
INSPECTION/TEST
button (
) 2 times and operate at test operation mode
for 3 minutes.
6
Press the
SWING
button to make sure the unit is in operation.
7
Press the
INSPECTION/TEST
button (
) and operate normally.
8
Confirm all functions of the unit according to the operation manual.
9
If the decoration panel has not been installed, turn off the power after the test operation.
/TEST
/TEST
Содержание RMXS-L Series
Страница 10: ...Safety Considerations Safety Considerations ix...
Страница 11: ...SiUS181305E 1 List of Functions Part 1 List of Functions 1 Functions 2 1 1 Outdoor Unit 2 1 2 Indoor Unit 3...
Страница 129: ...SiUS181305E Field Settings Test Operation and Field Settings 120...
Страница 144: ...FFQ09 12 15 18LVJU SiUS181305E 135 Remote Controller...
Страница 249: ...SiUS181305E Removal Procedure Booklet No Appendix 240...