Field Settings
SiUS181305E
107
Test Operation and Field Settings
Detailed Setting Procedure of Low Noise Operation and Demand Control
1. Setting mode 1 (H1P off)
In setting mode 2, push the
BS1
(
MODE
button) one time.
The system enters setting mode 1
and the H1P goes off.
In setting mode 1, the H6P (In low noise operation) and the H7P (In demand control) keep
lighting.
2. Setting mode 2 (H1P on)
(1) In setting mode 1, push and hold the
BS1
(
MODE
button) for more than 5 seconds.
The
system enters setting mode 2 and the H1P lights up.
(2) Push the
BS2
(
SET
button) several times and match the LED display with the Setting No. you
want.
(3) Push the
BS3
(
RETURN
button) one time, and the present setting content is displayed.
Push the
BS2
(
SET
button) several times and match the LED display with the setting content
(as shown on next page) you want.
(4) Push the
BS3
(
RETURN
button) two times.
The system returns to (1).
(5) Push the
BS1
(
MODE
button) one time.
The system returns to setting mode 1 and the H1P
goes off.
: ON
: OFF
l
: Blink
(1)
(2)
(3)
Setting
No.
Setting
contents
Setting No. indication
Setting No. indication
Setting
contents
Setting contents indication (Initial setting)
H1P H2P H3P H4P H5P H6P H7P H1P H2P H3P H4P H5P H6P H7P
H1P H2P H3P H4P H5P H6P H7P
12
External low
noise
setting /
Demand
setting
NO (Factory
setting)
l
YES
l
22
Night-time
low noise
setting
OFF
(Factory
setting)
Level 1
l
Level 2
l
Level 3
l
l
26
Night-time
low noise
operation
start setting
PM 8:00
l
PM 10:00
(Factory
setting)
l
PM 0:00
l
27
Night-time
low noise
operation
end setting
AM 6:00
l
AM 7:00
l
AM 8:00
(Factory
setting)
l
29
Capacity
precedence
setting
Low noise
precedence
(Factory
setting)
l
Capacity
precedence
l
30
Demand
setting 1
60 % of
rated power
consumption
l
70 % of
rated power
consumption
(Factory
setting)
l
80 % of
rated power
consumption
l
32
Constant
demand
setting
OFF
(Factory
setting)
l
ON
l
Setting mode indication section
Setting No. indication section
Set contents indication section
Содержание RMXS-L Series
Страница 10: ...Safety Considerations Safety Considerations ix...
Страница 11: ...SiUS181305E 1 List of Functions Part 1 List of Functions 1 Functions 2 1 1 Outdoor Unit 2 1 2 Indoor Unit 3...
Страница 129: ...SiUS181305E Field Settings Test Operation and Field Settings 120...
Страница 144: ...FFQ09 12 15 18LVJU SiUS181305E 135 Remote Controller...
Страница 249: ...SiUS181305E Removal Procedure Booklet No Appendix 240...