Field Settings
SiUS181305E
109
Test Operation and Field Settings
2.1.6 Setting of Vacuuming Mode
In order to perform vacuuming operation at site, fully open the expansion valves of indoor and
outdoor units and turn on some solenoid valves.
<Operating procedure>
(1) In setting mode 2 with units in stop mode, set the item No.21 (refrigerant recovery / vacuuming
mode) to ON. The respective expansion valve of indoor and outdoor units are fully opened.
Test
Operation
and
Under Centralized Control
are displayed on the remote controller, and the
indoor / outdoor unit operation is prohibited.
After setting, do not cancel setting mode 2 until completion of Vacuuming operation.
(2) Use the vacuum pump to perform vacuuming operation.
(3) Press the
MODE
(
BS1
) button once and reset setting mode 2.
2.1.7 Check Operation
To prevent any trouble in the period of installation at site, the system is provided with a test
operation mode enabling check for incorrect wiring, stop valve left in closed, coming out (or
misplacing with suction pipe thermistor) or discharge pipe thermistor and judgment of piping length,
refrigerant overcharging, and learning for the minimum opening degree of electronic expansion valve.
Unit stopping
Press the TEST button for 5 seconds.
10 seconds to 10 minutes
LED display (H1P~H7P) (
k
:
ON
h
:
OFF
l
:
BLINK)
h h k h h h h
h l h h h h k
Pressure equalizing
Step 1
20 seconds to 2 minutes
10 minutes
3 minutes
15 minutes
h l h h h k h
Cooling start control
Step 2
h l h h h k k
h l h h k k k
Stability waiting operation
Step 3
Refrigerant overcharge judgment
Step 7
•
Stop valve close check
•
Wrong wiring check
•
Piping length check
h l h h k h h
h l h h k h k
h l h h k k h
Judgment function
Step 4~6
5 seconds
h l h k h h k
h l h k h k h
Pump-down residual operation
Step 8
2 minutes
Standby for restarting
Completion
Step 9
(R12957)
Содержание RMXS-L Series
Страница 10: ...Safety Considerations Safety Considerations ix...
Страница 11: ...SiUS181305E 1 List of Functions Part 1 List of Functions 1 Functions 2 1 1 Outdoor Unit 2 1 2 Indoor Unit 3...
Страница 129: ...SiUS181305E Field Settings Test Operation and Field Settings 120...
Страница 144: ...FFQ09 12 15 18LVJU SiUS181305E 135 Remote Controller...
Страница 249: ...SiUS181305E Removal Procedure Booklet No Appendix 240...