SPEC
2-17
CABLE ROUTING DIAGRAM
1
Brake hose
2
Master cylinder
3
“ENGINE STOP” button lead
4
“ENGINE STOP” button
5
Throttle cable
6
Clutch cable
7
Clamp
8
Cable guide
A
Install the brake hose so that its pipe portion
directs as show and lightly touches the
projection on the master cylinder.
B
Pass the “ENGINE STOP” button lead in
the middle of the clutch holder.
C
Pass the clutch cable in front of the throttle
cable.
D
Clamp the “ENGINE STOP” button lead to
the handlebar to 3 clicks.
E
Pass the brake hose in front of the number
plate and through the cable guide.
F
Cross the clutch cable and throttle cable
over the number plate boss.
5NX-9-30-2 6/7/01 1:57 PM Page 58
Summary of Contents for YZ250(P)/LC
Page 2: ......
Page 128: ...3 3 INSP ADJ MEMO...
Page 582: ...TUN MEMO...
Page 583: ......
Page 584: ......