4-40
KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE GEAR
ENG
Extent of removal
Order
Part name
Q’ty
Remarks
RPIMARY DRIVE GEAR REMOVAL
Preparation for
Drain the transmission oil.
Refer to “TRANSMISSION OIL REPLACE-
removal
MENT“ section in the CHAPTER 3.
Bolt (brake pedal)
Shift the brake pedal downward.
Radiator hose 4
Disconnect at water pump side.
Bolt (push rod)
Refer to “CYLINDER HEAD, CYLINDER
AND PISTON” section.
1
Kick starter
1
2
Crankcase cover (right)
1
3
Bolt (Primary drive gear)
1
Only loosening
Refer to “REMOVAL POINTS”.
4
Primary driven gear
1
Refer to “CLUTCH AND PRIMARY
DRIVEN GEAR”section.
5
Primary drive gear
1
6
Thrust plate
1
EC4C0000
KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE GEAR
EC4C8000
PRIMARY DRIVE GEAR
1
Extent of removal:
1
Primary drive gear removal
30 Nm (3.0 m•kg, 22 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
55 Nm (5.5 m•kg, 40 ft•lb)
5NX-9-30-4B 6/7/01 1:56 PM Page 26
Summary of Contents for YZ250(P)/LC
Page 2: ......
Page 128: ...3 3 INSP ADJ MEMO...
Page 582: ...TUN MEMO...
Page 583: ......
Page 584: ......