CAMSHAFTS
5-24
c. Check that the cylinder head cover gasket “2”
is installed properly between the cylinder
head cover and the cylinder head.
d. Install the electrical components tray bolts.
Refer to “GENERAL CHASSIS” on page 4-1.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
4. Tighten:
• Cylinder head cover bolts
TIP
Tighten the cylinder head cover bolts in stages
and in a crisscross pattern.
5. Install:
• Brake pipe (hydraulic unit to left front brake
caliper)
• Brake pipe (front brake master cylinder to hy-
draulic unit)
• Clutch pipe
6. Install:
• Brake hose holders “1”
TIP
Be sure to fit the projection “a” on the outer sec-
tion of the brake hose holder into the hole “b” in
the inner section.
7. Install:
• Clutch hose holder bolt “1”
TIP
Insert the tab “a” on the clutch hose holder into
the slot “b” in the frame.
8. Install:
• Brake hose joint bolt (hydraulic unit to left
front brake caliper) “1”
• Brake hose joint bolt (front brake master cyl-
inder to hydraulic unit) “2”
TIP
Make sure that the tab “a” on the brake hose
joint bracket contacts the side of the brake hose
joint “b”.
T
R
.
.
Cylinder head cover bolt
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
T
R
.
.
Brake hose holder bolt
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
2
2
1
1
a b
T
R
.
.
Clutch hose holder bolt
9 Nm (0.9 m·kgf, 6.5 ft·lbf)
T
R
.
.
Brake hose joint bolt (hydraulic
unit to left front brake caliper)
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
Brake hose joint bolt (front brake
master cylinder to hydraulic unit)
9 Nm (0.9 m·kgf, 6.5 ft·lbf)
b
a
1
b
a
1
Summary of Contents for XT1200Z(Z) 2010
Page 1: ...2010 SERVICE MANUAL XT1200Z Z 23P 28197 E0 ...
Page 6: ......
Page 8: ......
Page 70: ...ENGINE SPECIFICATIONS 2 9 Final gear backlash 0 20 0 40 mm 0 008 0 016 in ...
Page 88: ...TIGHTENING TORQUES 2 27 2 1 ...
Page 100: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 Oil pump left side view 8 2 1 3 4 5 6 7 ...
Page 102: ...COOLING SYSTEM DIAGRAMS 2 41 EAS20420 COOLING SYSTEM DIAGRAMS 4 2 5 1 4 2 3 8 7 6 3 4 ...
Page 112: ...CABLE ROUTING 2 51 Fuel tank and throttle bodies left side view A B C D E F G 1 2 3 3 5 3 4 6 ...
Page 124: ...CABLE ROUTING 2 63 Engine right side view A 1 2 3 4 5 6 3 3 4 5 5 C E F B 6 7 G D ...
Page 132: ...CABLE ROUTING 2 71 Rear fender top view A B C D E E F G 1 1 2 2 3 4 5 6 H I J 1 2 3 4 6 7 4 3 ...
Page 134: ...CABLE ROUTING 2 73 ...
Page 137: ......
Page 292: ...SHAFT DRIVE 4 119 ...
Page 337: ...CYLINDER AND PISTONS 5 42 1 ...
Page 432: ...WATER PUMP 6 11 ...
Page 449: ......
Page 455: ...IGNITION SYSTEM 8 6 ...
Page 461: ...ELECTRIC STARTING SYSTEM 8 12 ...
Page 463: ...CHARGING SYSTEM 8 14 1 AC magneto 2 Rectifier regulator 3 Main fuse 4 Battery ...
Page 465: ...CHARGING SYSTEM 8 16 ...
Page 527: ...FUEL PUMP SYSTEM 8 78 ...
Page 536: ...IMMOBILIZER SYSTEM 8 87 a Light on b Light off ...
Page 537: ...IMMOBILIZER SYSTEM 8 88 ...
Page 541: ...ABS ANTI LOCK BRAKE SYSTEM 8 92 ...
Page 581: ...ABS ANTI LOCK BRAKE SYSTEM 8 132 ...
Page 584: ...ELECTRICAL COMPONENTS 8 135 1 2 3 4 5 6 7 8 10 9 11 13 15 14 16 12 17 18 19 ...
Page 606: ...ELECTRICAL COMPONENTS 8 157 ...
Page 613: ......
Page 614: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...