
FRONT WHEEL
4-28
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Insert the front wheel axle from the right side
and tighten it to 72 Nm (7.2 m·kgf, 52 ft·lbf).
b. In the order pinch bolt “1”
→
pinch bolt “2”
→
pinch bolt “1”, tighten each bolt to 21 Nm (2.1
m·kgf, 15 ft·lbf) without performing temporary
tightening.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
6. Measure:
TIP
Measure the distance “a” only if the wheel bear-
ings, wheel sensor rotor, or both were replaced.
• Distance “a”
(between the wheel sensor rotor “1” and
wheel sensor housing “2”)
Out of specification
→
Reinstall the bearing
or replace the wheel sensor rotor.
7. Install:
• Front brake calipers
• Front reflectors (for Oceania)
• Front wheel sensor lead guide (for Europe)
• Front wheel sensor lead holder
• Front wheel sensor
• Front brake hose holder
TIP
When installing the front wheel sensor, check
the wheel sensor lead for twists and the sensor
electrode for foreign materials.
NOTICE
ECA23P1012
• Make sure there are no foreign materials in
the wheel hub. Foreign materials cause
damage to the inner sensor rotor and wheel
sensor.
• To route the front wheel sensor lead, refer
to “CABLE ROUTING” on page 2-43.
WARNING
EWA13500
Make sure the brake hose is routed properly.
8. Check:
• Front wheel sensor installation
Check if the wheel sensor housing is installed
properly.
Distance “a” (between the wheel
sensor rotor and wheel sensor
housing)
18.0–18.2 mm (0.71–0.72 in)
2
1
a
1
2
T
R
.
.
Front brake caliper bolt
40 Nm (4.0 m·kgf, 29 ft·lbf)
Front wheel sensor bolt
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
Front brake hose holder bolt
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
Summary of Contents for XT1200Z(Z) 2010
Page 1: ...2010 SERVICE MANUAL XT1200Z Z 23P 28197 E0 ...
Page 6: ......
Page 8: ......
Page 70: ...ENGINE SPECIFICATIONS 2 9 Final gear backlash 0 20 0 40 mm 0 008 0 016 in ...
Page 88: ...TIGHTENING TORQUES 2 27 2 1 ...
Page 100: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 Oil pump left side view 8 2 1 3 4 5 6 7 ...
Page 102: ...COOLING SYSTEM DIAGRAMS 2 41 EAS20420 COOLING SYSTEM DIAGRAMS 4 2 5 1 4 2 3 8 7 6 3 4 ...
Page 112: ...CABLE ROUTING 2 51 Fuel tank and throttle bodies left side view A B C D E F G 1 2 3 3 5 3 4 6 ...
Page 124: ...CABLE ROUTING 2 63 Engine right side view A 1 2 3 4 5 6 3 3 4 5 5 C E F B 6 7 G D ...
Page 132: ...CABLE ROUTING 2 71 Rear fender top view A B C D E E F G 1 1 2 2 3 4 5 6 H I J 1 2 3 4 6 7 4 3 ...
Page 134: ...CABLE ROUTING 2 73 ...
Page 137: ......
Page 292: ...SHAFT DRIVE 4 119 ...
Page 337: ...CYLINDER AND PISTONS 5 42 1 ...
Page 432: ...WATER PUMP 6 11 ...
Page 449: ......
Page 455: ...IGNITION SYSTEM 8 6 ...
Page 461: ...ELECTRIC STARTING SYSTEM 8 12 ...
Page 463: ...CHARGING SYSTEM 8 14 1 AC magneto 2 Rectifier regulator 3 Main fuse 4 Battery ...
Page 465: ...CHARGING SYSTEM 8 16 ...
Page 527: ...FUEL PUMP SYSTEM 8 78 ...
Page 536: ...IMMOBILIZER SYSTEM 8 87 a Light on b Light off ...
Page 537: ...IMMOBILIZER SYSTEM 8 88 ...
Page 541: ...ABS ANTI LOCK BRAKE SYSTEM 8 92 ...
Page 581: ...ABS ANTI LOCK BRAKE SYSTEM 8 132 ...
Page 584: ...ELECTRICAL COMPONENTS 8 135 1 2 3 4 5 6 7 8 10 9 11 13 15 14 16 12 17 18 19 ...
Page 606: ...ELECTRICAL COMPONENTS 8 157 ...
Page 613: ......
Page 614: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...