REAR SHOCK ABSORBER ASSEMBLY
4-99
• Spacer
Damage/scratches
→
Replace.
• Bolts
Bends/damage/wear
→
Replace.
EAS23261
CHECKING THE CONNECTING ARM AND
RELAY ARM
1. Check:
• Connecting arms
• Relay arm
Damage/wear
→
Replace.
2. Check:
• Bearings
• Oil seals
Damage/pitting
→
Replace.
3. Check:
• Spacers
Damage/scratches
→
Replace.
EAS23272
INSTALLING THE RELAY ARM
1. Lubricate:
• Oil seals
2. Install:
• Bearings “1”, “2”
(to the swingarm and relay arm)
• Oil seals “3”, “4”
(to the swingarm and relay arm)
TIP
• When installing the oil seals “3” to the relay arm
or swingarm, face the paint mark of the oil
seals outside.
• When installing the oil seals “4” to the relay
arm, face the character stamp of the oil seals
outside.
EAS23311
INSTALLING THE REAR SHOCK
ABSORBER ASSEMBLY
1. Install:
• Rear shock absorber assembly
TIP
When installing the rear shock absorber assem-
bly, lift up the swingarm.
Recommended lubricant
Lithium-soap-based grease
Installed depth “a”
5.5–6.5 mm (0.22–0.26 in)
Installed depth “b”
6.0 mm (0.24 in)
Installed depth “c”
3.5–4.5 mm (0.14–0.18 in)
Installed depth “d”
4.0 mm (0.16 in)
New
5. Relay arm
6. Connecting arm
7. Swingarm
8. Frame
A. Left side
B. Right side
6
6
3
3
7
1
b
a
4
5
2
4
È
É
3
3
1
3
3
8
1
d
b
b
a
a
c
Summary of Contents for XT1200Z(Z) 2010
Page 1: ...2010 SERVICE MANUAL XT1200Z Z 23P 28197 E0 ...
Page 6: ......
Page 8: ......
Page 70: ...ENGINE SPECIFICATIONS 2 9 Final gear backlash 0 20 0 40 mm 0 008 0 016 in ...
Page 88: ...TIGHTENING TORQUES 2 27 2 1 ...
Page 100: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 Oil pump left side view 8 2 1 3 4 5 6 7 ...
Page 102: ...COOLING SYSTEM DIAGRAMS 2 41 EAS20420 COOLING SYSTEM DIAGRAMS 4 2 5 1 4 2 3 8 7 6 3 4 ...
Page 112: ...CABLE ROUTING 2 51 Fuel tank and throttle bodies left side view A B C D E F G 1 2 3 3 5 3 4 6 ...
Page 124: ...CABLE ROUTING 2 63 Engine right side view A 1 2 3 4 5 6 3 3 4 5 5 C E F B 6 7 G D ...
Page 132: ...CABLE ROUTING 2 71 Rear fender top view A B C D E E F G 1 1 2 2 3 4 5 6 H I J 1 2 3 4 6 7 4 3 ...
Page 134: ...CABLE ROUTING 2 73 ...
Page 137: ......
Page 292: ...SHAFT DRIVE 4 119 ...
Page 337: ...CYLINDER AND PISTONS 5 42 1 ...
Page 432: ...WATER PUMP 6 11 ...
Page 449: ......
Page 455: ...IGNITION SYSTEM 8 6 ...
Page 461: ...ELECTRIC STARTING SYSTEM 8 12 ...
Page 463: ...CHARGING SYSTEM 8 14 1 AC magneto 2 Rectifier regulator 3 Main fuse 4 Battery ...
Page 465: ...CHARGING SYSTEM 8 16 ...
Page 527: ...FUEL PUMP SYSTEM 8 78 ...
Page 536: ...IMMOBILIZER SYSTEM 8 87 a Light on b Light off ...
Page 537: ...IMMOBILIZER SYSTEM 8 88 ...
Page 541: ...ABS ANTI LOCK BRAKE SYSTEM 8 92 ...
Page 581: ...ABS ANTI LOCK BRAKE SYSTEM 8 132 ...
Page 584: ...ELECTRICAL COMPONENTS 8 135 1 2 3 4 5 6 7 8 10 9 11 13 15 14 16 12 17 18 19 ...
Page 606: ...ELECTRICAL COMPONENTS 8 157 ...
Page 613: ......
Page 614: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...