SHAFT DRIVE
4-115
b. To find final drive pinion gear shim thickness
“A”, use the following formula:
Where:
a = 85.00
b = a numeral on the final gear case, to be di-
vided by 100 and added to “84”.
Example:
If the final gear case is marked “52”:
Round off to the hundredths digit and select
the appropriate shim(s).
TIP
In the example above, the calculated final drive
pinion gear shim thickness is 0.28 mm (0.011
in). The chart instructs you to round off the 8 to
10. Thus, you should use a 0.30 mm (0.012 in)
final drive pinion gear shim.
Shim sizes are supplied in the following thick-
nesses.
c. To find ring gear shim thickness “B”, use the
following formula:
Where:
c = a numeral on the final gear case, to be di-
vided by 100 and added to “52”.
d = a numeral indicated by the punch mark on
the ring gear bearing housing, to be divided
by 100 and added to “1”.
e = a numeral (positive or negative) on the in-
side of the ring gear, to be divided by 100 and
added to “38.50”.
f = the bearing thickness constant.
Example:
If the final drive housing is marked “97”, the
ring gear bearing housing is marked “03”, the
ring gear is marked “- 08”, and “f” is 13.00:
Round off the hundredths digit and select ap-
propriate shim(s).
Final drive pinion gear shim thickness
A = a - b - 0.2
A
=
85.00 - (84 + 52/100) - 0.2
=
85.00 - (84 + 0.52) - 0.2
=
85.00 - 84.52 - 0.2
=
0.28
Hundredth
Rounded value
0, 1, 2
0
3, 4, 5, 6, 7
5
8, 9
10
Final drive pinion gear shims
Thickness (mm)
0.15 0.30 0.40 0.45 0.50 0.60
Ring gear shim thickness
B = c - d - e - f
52
97
b
Bearing thickness
13.00 mm (0.51 in)
B
=
(52 + 97/100) - (1 + 03/100) -
(38.50 - 08/100) - 13.00
=
(52 + 0.97) - (1 + 0.03) -
(38.50 - 0.08) - 13.00
=
52.97 - 1.03 - 38.42 - 13.00
=
0.52
02
0
1
03
04
05
52
97
c
d
e
Summary of Contents for XT1200Z(Z) 2010
Page 1: ...2010 SERVICE MANUAL XT1200Z Z 23P 28197 E0 ...
Page 6: ......
Page 8: ......
Page 70: ...ENGINE SPECIFICATIONS 2 9 Final gear backlash 0 20 0 40 mm 0 008 0 016 in ...
Page 88: ...TIGHTENING TORQUES 2 27 2 1 ...
Page 100: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 Oil pump left side view 8 2 1 3 4 5 6 7 ...
Page 102: ...COOLING SYSTEM DIAGRAMS 2 41 EAS20420 COOLING SYSTEM DIAGRAMS 4 2 5 1 4 2 3 8 7 6 3 4 ...
Page 112: ...CABLE ROUTING 2 51 Fuel tank and throttle bodies left side view A B C D E F G 1 2 3 3 5 3 4 6 ...
Page 124: ...CABLE ROUTING 2 63 Engine right side view A 1 2 3 4 5 6 3 3 4 5 5 C E F B 6 7 G D ...
Page 132: ...CABLE ROUTING 2 71 Rear fender top view A B C D E E F G 1 1 2 2 3 4 5 6 H I J 1 2 3 4 6 7 4 3 ...
Page 134: ...CABLE ROUTING 2 73 ...
Page 137: ......
Page 292: ...SHAFT DRIVE 4 119 ...
Page 337: ...CYLINDER AND PISTONS 5 42 1 ...
Page 432: ...WATER PUMP 6 11 ...
Page 449: ......
Page 455: ...IGNITION SYSTEM 8 6 ...
Page 461: ...ELECTRIC STARTING SYSTEM 8 12 ...
Page 463: ...CHARGING SYSTEM 8 14 1 AC magneto 2 Rectifier regulator 3 Main fuse 4 Battery ...
Page 465: ...CHARGING SYSTEM 8 16 ...
Page 527: ...FUEL PUMP SYSTEM 8 78 ...
Page 536: ...IMMOBILIZER SYSTEM 8 87 a Light on b Light off ...
Page 537: ...IMMOBILIZER SYSTEM 8 88 ...
Page 541: ...ABS ANTI LOCK BRAKE SYSTEM 8 92 ...
Page 581: ...ABS ANTI LOCK BRAKE SYSTEM 8 132 ...
Page 584: ...ELECTRICAL COMPONENTS 8 135 1 2 3 4 5 6 7 8 10 9 11 13 15 14 16 12 17 18 19 ...
Page 606: ...ELECTRICAL COMPONENTS 8 157 ...
Page 613: ......
Page 614: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...