GENERATOR AND STARTER CLUTCH
5-46
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Install the starter clutch gear “1” onto the gen-
erator rotor “2” and hold the generator rotor.
b. When turning the starter clutch gear clock-
wise “A”, the starter clutch and the starter
clutch gear should engage, otherwise the
starter clutch is faulty and must be replaced.
c. When turning the starter clutch gear counter-
clockwise “B”, it should turn freely, otherwise
the starter clutch is faulty and must be re-
placed.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
EAS3D81022
CHECKING THE TORQUE LIMITER
1. Check:
• Torque limiter
Damage/wear
→
Replace.
TIP
Do not disassemble the torque limiter.
EAS24600
INSTALLING THE STARTER CLUTCH
1. Install:
• Starter clutch “1”
• Washer “2”
TIP
• Install the starter clutch so that the side of the
starter clutch roller assembly with the arrow
mark “a” is toward the generator rotor “3”.
• While holding the generator rotor with the
sheave holder “4”, tighten the starter clutch
bolts.
EAS24500
INSTALLING THE GENERATOR
1. Install:
• Woodruff key
• Generator rotor
• Washer
• Generator rotor bolt
TIP
• Clean the tapered portion of the crankshaft and
the generator rotor hub.
• When installing the generator rotor, make sure
the woodruff key is properly seated in the key-
way of the crankshaft.
• Lubricate the generator rotor bolt threads and
washer mating surfaces with engine oil.
2. Tighten:
• Generator rotor bolt “1”
TIP
While holding the generator rotor “2” with the
sheave holder “3”, tighten the generator rotor
bolt.
T
R
.
.
Starter clutch bolt
32 Nm (3.2 m·kgf, 23 ft·lbf)
LOCTITE®
Sheave holder
90890-01701
Primary clutch holder
YS-01880-A
1
A
B
2
T
R
.
.
Generator rotor bolt
130 Nm (13 m·kgf, 94 ft·lbf)
Sheave holder
90890-01701
Primary clutch holder
YS-01880-A
1
a
3
2
3
4
Summary of Contents for XT1200Z(Z) 2010
Page 1: ...2010 SERVICE MANUAL XT1200Z Z 23P 28197 E0 ...
Page 6: ......
Page 8: ......
Page 70: ...ENGINE SPECIFICATIONS 2 9 Final gear backlash 0 20 0 40 mm 0 008 0 016 in ...
Page 88: ...TIGHTENING TORQUES 2 27 2 1 ...
Page 100: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 Oil pump left side view 8 2 1 3 4 5 6 7 ...
Page 102: ...COOLING SYSTEM DIAGRAMS 2 41 EAS20420 COOLING SYSTEM DIAGRAMS 4 2 5 1 4 2 3 8 7 6 3 4 ...
Page 112: ...CABLE ROUTING 2 51 Fuel tank and throttle bodies left side view A B C D E F G 1 2 3 3 5 3 4 6 ...
Page 124: ...CABLE ROUTING 2 63 Engine right side view A 1 2 3 4 5 6 3 3 4 5 5 C E F B 6 7 G D ...
Page 132: ...CABLE ROUTING 2 71 Rear fender top view A B C D E E F G 1 1 2 2 3 4 5 6 H I J 1 2 3 4 6 7 4 3 ...
Page 134: ...CABLE ROUTING 2 73 ...
Page 137: ......
Page 292: ...SHAFT DRIVE 4 119 ...
Page 337: ...CYLINDER AND PISTONS 5 42 1 ...
Page 432: ...WATER PUMP 6 11 ...
Page 449: ......
Page 455: ...IGNITION SYSTEM 8 6 ...
Page 461: ...ELECTRIC STARTING SYSTEM 8 12 ...
Page 463: ...CHARGING SYSTEM 8 14 1 AC magneto 2 Rectifier regulator 3 Main fuse 4 Battery ...
Page 465: ...CHARGING SYSTEM 8 16 ...
Page 527: ...FUEL PUMP SYSTEM 8 78 ...
Page 536: ...IMMOBILIZER SYSTEM 8 87 a Light on b Light off ...
Page 537: ...IMMOBILIZER SYSTEM 8 88 ...
Page 541: ...ABS ANTI LOCK BRAKE SYSTEM 8 92 ...
Page 581: ...ABS ANTI LOCK BRAKE SYSTEM 8 132 ...
Page 584: ...ELECTRICAL COMPONENTS 8 135 1 2 3 4 5 6 7 8 10 9 11 13 15 14 16 12 17 18 19 ...
Page 606: ...ELECTRICAL COMPONENTS 8 157 ...
Page 613: ......
Page 614: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...