Emprise 7000 Installation and Service Guide
i
Emprise 7000 Installation and Service Guide
Emprise 7000 Installation Checklist ........................................................... 1
Rack Mount Components............................................................................................... 1
Cable the Emprise 7000................................................................................................. 2
Power Up and Configure the Emprise 7000 Components ............................................. 3
Chapter 1: Before Installation .................................................................... 5
Emprise 7000 System Components .................................................................................... 6
Emprise 7000 System Packaging ........................................................................................ 6
Choosing a Location ............................................................................................................ 7
Installation Requirements .................................................................................................... 8
Power Considerations .......................................................................................................... 9
Using a UPS ........................................................................................................................ 9
Power Implementation ................................................................................................. 10
Emprise 7000 System Specifications................................................................................. 12
Configuration Specifications......................................................................................... 12
Connectivity Specifications .......................................................................................... 12
Emprise 7000 Environmental Specifications................................................................ 12
Component Physical Specifications ............................................................................. 13
ICON Physical Specifications................................................................................. 13
ISE Physical Specifications .................................................................................... 13
System Controller Physical Specifications ............................................................. 13
Storage Fabric Switch Specifications........................................................................... 14
Management Network Switch Specifications ............................................................... 14
PDU Specifications ...................................................................................................... 15
Electrical Specifications ......................................................................................... 15
Physical Specifications........................................................................................... 15
Environmental Specifications ................................................................................. 16
Chapter 2: Rack Mounting Emprise 7000 Components........................... 17
Recommended Placement of Components ....................................................................... 18
Rack Mounting an ISE ....................................................................................................... 19
Unpacking the ISE ....................................................................................................... 19
ISE Crate................................................................................................................ 19
ISE Carton.............................................................................................................. 21
Assembling and Installing the Rail Kit .......................................................................... 22
Installing the ISE Chassis ............................................................................................ 23
Installing DataPacs ...................................................................................................... 24
Installing Batteries........................................................................................................ 24
Attaching the Bezel ...................................................................................................... 25
Installing Power Supplies ............................................................................................. 26
Rack Mounting the Switches.............................................................................................. 27
Rack Mounting the ICON Appliance .................................................................................. 28
Rack Mounting the System Controller ............................................................................... 31
Verifying that the Air Deflector and Cards are Seated Properly................................... 32
Installing Storage-Side FCICs or NICs into the System Controller(s) .......................... 34
Rack Mounting a System Controller............................................................................. 35
Rack Mounting the PDU .................................................................................................... 37