Emprise 7000 Installation and Service Guide 1
Emprise 7000
Installation Checklist
Rack Mount Components
Task
Reference
Rack mount ISE.
See page 19.
Rack mount the switches:
•
Storage fabric
•
Ethernet
•
Front-end fabric SAN
See page 27.
See manufacturer’s
documentation for
installation procedures
Rack mount the ICON appliance.
See page 28.
Rack mount the system controllers:
•
Verify the air deflector and cards are seated
properly.
•
Install storage side interface cards.
•
Rack mount the controllers.
See page 31.
Rack mount the PDUs.
See page 37.