Maintenance
0012
−
1/A1
Winterthur Gas & Diesel Ltd.
General Guidelines for Lifting Tools
Wire Rope Slings, Span Sets, Eye Bolts, etc.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.
General
The permitted capacities of the engine room crane, lifting equipment, ropes, chains,
eye bolts, etc must always be related to the weights of the parts to be lifted. For more
Masses (Weights).
Note: The maximum permitted load in kg is related to the Work Load
Limit (WLL).
For the removal, installation and movement of engine components, use only the
correct serviceable tools and equipment. Replace damaged equipment with
serviceable items.
For the safe and correct operation of the engine room crane, it is recommended that
you do as follows:
D
Make sure that you know the weight of the load.
D
Find the centers of the load.
D
Use only the applicable equipment.
D
Make sure that you correctly attach and remove the the equipment.
2.
Equipment
2.1
Wire Rope Slings
The WLL of the wire rope slings is given with their tool numbers in
Tool List.
2.2
Span Sets
Span sets are easy to use. The code and the color usually show the maximum
permitted load. Loops and knots in the span-sets decrease their WLL by one third.
2.3
Eye Bolts and Eye Nuts
Use only eye bolts and eye nuts that have the standards given in DIN 580 and DIN
582: 2003
−
08.
Where eye bolts and eye nuts are used, the standards are calculated from DIN 580
and DIN 582: 2003
−
08 and the results shown in
below.
2017
Summary of Contents for X35-B
Page 12: ...Intentionally blank ...
Page 14: ...Intentionally blank ...
Page 16: ...Intentionally blank ...
Page 34: ...Intentionally blank ...
Page 58: ...Intentionally blank ...
Page 60: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 2 6 WCH03791 2017 ...
Page 61: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 3 6 WCH03791 2017 ...
Page 62: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 4 6 WCH03791 2017 ...
Page 63: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 5 6 WCH03791 2017 ...
Page 64: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 6 6 WCH03791 2017 ...
Page 68: ...Intentionally blank ...
Page 72: ...Intentionally blank ...
Page 82: ...Intentionally blank ...
Page 85: ...Intentionally blank ...
Page 92: ...Intentionally blank ...
Page 96: ...Intentionally blank ...
Page 112: ...Intentionally blank ...
Page 120: ...Intentionally blank ...
Page 124: ...Intentionally blank ...
Page 138: ...Intentionally blank ...
Page 154: ...Intentionally blank ...
Page 168: ...Intentionally blank ...
Page 180: ...Intentionally blank ...
Page 182: ...Maintenance 2728 1 A1 Winterthur Gas Diesel Ltd 2 5 6 Lift housing from the valve spindle 4 ...
Page 186: ...Intentionally blank ...
Page 190: ......
Page 204: ...Intentionally blank ...
Page 211: ...Intentionally blank ...
Page 216: ...Intentionally blank ...
Page 224: ...Intentionally blank ...
Page 228: ......
Page 229: ...Intentionally blank ...
Page 264: ...Intentionally blank ...
Page 270: ...Intentionally blank ...
Page 280: ...Intentionally blank ...
Page 294: ...Intentionally blank ...
Page 298: ...Intentionally blank ...
Page 302: ...Intentionally blank ...
Page 318: ...Intentionally blank ...
Page 328: ...Intentionally blank ...
Page 344: ...Intentionally blank ...
Page 368: ...Intentionally blank ...
Page 374: ...Intentionally blank ...
Page 380: ...Intentionally blank ...
Page 396: ...Intentionally blank ...
Page 407: ...Intentionally blank ...
Page 426: ...Intentionally blank ...
Page 442: ...Intentionally blank ...
Page 444: ...Intentionally blank ...