Maintenance
2751
−
1/A1
Winterthur Gas & Diesel Ltd.
Table 1: Recommended jointing compounds and adhesive primers
Jointing
compound
Hardener
Adhesive
primer
Manufacturer
Elastosil
RT 622 A
RT 622 B
G 790
Wacker-Chemie Gmbh
Geschäftsbereich Silicone
Hanns-Seidel-Platz 4
D-81737 München
Silcoset
105 RTV
Silcoset
Curing Agent A
Silcoset Primer AMBERSIL LTD
Wylds Rd
Bridgwater
Somerset
TA6 4DD
Uk-Great Britain
Note: Mixing and applying of the jointing compounds must be done according to
the instruction of the respective manufacturer.
Products of other manufacturers are also allowed when fulfilling the below specification:
1) Containing no acid, e.g. no acetic acid.
2) Resistant to oil, marine diesel oil, heavy fuel oil and water at a permanent
temperature of approximately 100
_
C.
3) Short age hardening time, i.e. at least 24 hours under ISO standard reference
conditions.
4) Well flowing to properly fill out the annular space, in order to avoid the creation of
any hollow space.
5) Good adhesion on adhesive-primed metallic surface.
6) Easy to prepare and combine.
7) None or only minimal surface shrinkage.
8) The jointing compound must remain elastic, as a cylinder cover bolt may be
removed at any given time.
2017
Removal and Fitting of Exhaust Valve, Replacing of Elastic Bolts
Summary of Contents for X35-B
Page 12: ...Intentionally blank ...
Page 14: ...Intentionally blank ...
Page 16: ...Intentionally blank ...
Page 34: ...Intentionally blank ...
Page 58: ...Intentionally blank ...
Page 60: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 2 6 WCH03791 2017 ...
Page 61: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 3 6 WCH03791 2017 ...
Page 62: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 4 6 WCH03791 2017 ...
Page 63: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 5 6 WCH03791 2017 ...
Page 64: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 6 6 WCH03791 2017 ...
Page 68: ...Intentionally blank ...
Page 72: ...Intentionally blank ...
Page 82: ...Intentionally blank ...
Page 85: ...Intentionally blank ...
Page 92: ...Intentionally blank ...
Page 96: ...Intentionally blank ...
Page 112: ...Intentionally blank ...
Page 120: ...Intentionally blank ...
Page 124: ...Intentionally blank ...
Page 138: ...Intentionally blank ...
Page 154: ...Intentionally blank ...
Page 168: ...Intentionally blank ...
Page 180: ...Intentionally blank ...
Page 182: ...Maintenance 2728 1 A1 Winterthur Gas Diesel Ltd 2 5 6 Lift housing from the valve spindle 4 ...
Page 186: ...Intentionally blank ...
Page 190: ......
Page 204: ...Intentionally blank ...
Page 211: ...Intentionally blank ...
Page 216: ...Intentionally blank ...
Page 224: ...Intentionally blank ...
Page 228: ......
Page 229: ...Intentionally blank ...
Page 264: ...Intentionally blank ...
Page 270: ...Intentionally blank ...
Page 280: ...Intentionally blank ...
Page 294: ...Intentionally blank ...
Page 298: ...Intentionally blank ...
Page 302: ...Intentionally blank ...
Page 318: ...Intentionally blank ...
Page 328: ...Intentionally blank ...
Page 344: ...Intentionally blank ...
Page 368: ...Intentionally blank ...
Page 374: ...Intentionally blank ...
Page 380: ...Intentionally blank ...
Page 396: ...Intentionally blank ...
Page 407: ...Intentionally blank ...
Page 426: ...Intentionally blank ...
Page 442: ...Intentionally blank ...
Page 444: ...Intentionally blank ...