Maintenance
3103
−
1/A1
Winterthur Gas & Diesel Ltd.
4.
Calculate
Fig. 3
STROKE
D
94305
n
BDC
n
TDC
The difference between the values shown shows the crank deflection during one full
Where values are measured that are more than the maximum permitted limits, the
cause must be found. The necessary procedures must then be done to repair the
problem (defective main bearing, engine stay changed because of hull deformation,
loose hold-down bolts, defective propeller shaft bearings or equipment 94305, etc.).
The limits are applicable for all conditions of ship service after delivery, i.e.:
D
The draught and trim are in the limits for usual operation.
D
The engine is stopped and is hot or cold.
D
If the engine is in a cold condition the tank heating (which is close to or below the
main engine and the pre-heater of the main lubricating oil separator) must not be
in operation for a minimum of eight hours before the procedure given in
Usual Operation: Crank-web Deflection Limits (mm)
Vertical
Horizontal
Cylinder No. 1
(Driving end)
Cylinder No. 2
to next to last
cylinder
Last cylinder
(Free end)
All cylinders
Note 1)
Note 2)
0.27
−
0.27
0.19
−
0.19
0.19
−
0.27
0.19
−
0.27
0.09
−
0.09
1) For engine without a torsional vibration damper or front disc or free end PTO.
2) For engine with a torsional vibration damper or front disc or free end PTO.
Speak to Winterthur Gas & Diesel Ltd, if the final indications are more than the limits
given in the table above.
2017
Crank Deflection
−
Measure
Summary of Contents for X35-B
Page 12: ...Intentionally blank ...
Page 14: ...Intentionally blank ...
Page 16: ...Intentionally blank ...
Page 34: ...Intentionally blank ...
Page 58: ...Intentionally blank ...
Page 60: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 2 6 WCH03791 2017 ...
Page 61: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 3 6 WCH03791 2017 ...
Page 62: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 4 6 WCH03791 2017 ...
Page 63: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 5 6 WCH03791 2017 ...
Page 64: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 6 6 WCH03791 2017 ...
Page 68: ...Intentionally blank ...
Page 72: ...Intentionally blank ...
Page 82: ...Intentionally blank ...
Page 85: ...Intentionally blank ...
Page 92: ...Intentionally blank ...
Page 96: ...Intentionally blank ...
Page 112: ...Intentionally blank ...
Page 120: ...Intentionally blank ...
Page 124: ...Intentionally blank ...
Page 138: ...Intentionally blank ...
Page 154: ...Intentionally blank ...
Page 168: ...Intentionally blank ...
Page 180: ...Intentionally blank ...
Page 182: ...Maintenance 2728 1 A1 Winterthur Gas Diesel Ltd 2 5 6 Lift housing from the valve spindle 4 ...
Page 186: ...Intentionally blank ...
Page 190: ......
Page 204: ...Intentionally blank ...
Page 211: ...Intentionally blank ...
Page 216: ...Intentionally blank ...
Page 224: ...Intentionally blank ...
Page 228: ......
Page 229: ...Intentionally blank ...
Page 264: ...Intentionally blank ...
Page 270: ...Intentionally blank ...
Page 280: ...Intentionally blank ...
Page 294: ...Intentionally blank ...
Page 298: ...Intentionally blank ...
Page 302: ...Intentionally blank ...
Page 318: ...Intentionally blank ...
Page 328: ...Intentionally blank ...
Page 344: ...Intentionally blank ...
Page 368: ...Intentionally blank ...
Page 374: ...Intentionally blank ...
Page 380: ...Intentionally blank ...
Page 396: ...Intentionally blank ...
Page 407: ...Intentionally blank ...
Page 426: ...Intentionally blank ...
Page 442: ...Intentionally blank ...
Page 444: ...Intentionally blank ...