Maintenance
3326
−
2/A2
Winterthur Gas & Diesel Ltd.
Note: During step
), make sure that the
elastic bolts in the connecting rod
align with the holes in the
crosshead pin.
28) Remove the tool (94332,
) from
the column and the tool (94337).
29) Remove the tools (94337) from the
connecting rod.
30) Lower carefully the crosshead pin on to
the connecting rod.
31) Remove all manual ratchets, eye bolts
and the chain block.
32) Remove all protection from the the
openings in the crosshead pin.
33) Do the clearance checks, refer to
.
6.
Completion
1) Install the round nuts to the elastic studs
on the connecting rod, refer to
2) Install the top bearing cover, refer to
.
3) Disengage the turning gear.
4) Set the lubricating oil pump to on.
5) Make sure that the crosshead and the
bottom end bearings of the connecting
rod have sufficient lubrication.
6) Unlock the turning gear.
Crosshead Pin
−
Removal and Installation
2017
94144
94143
1
I
I
WCH00617
EB2
EB2
7
5
4
3
6
94019L
I - I
94324
EB1
EB1
Engine
Room
Crane
H1
Fig. 10
Summary of Contents for X35-B
Page 12: ...Intentionally blank ...
Page 14: ...Intentionally blank ...
Page 16: ...Intentionally blank ...
Page 34: ...Intentionally blank ...
Page 58: ...Intentionally blank ...
Page 60: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 2 6 WCH03791 2017 ...
Page 61: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 3 6 WCH03791 2017 ...
Page 62: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 4 6 WCH03791 2017 ...
Page 63: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 5 6 WCH03791 2017 ...
Page 64: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 6 6 WCH03791 2017 ...
Page 68: ...Intentionally blank ...
Page 72: ...Intentionally blank ...
Page 82: ...Intentionally blank ...
Page 85: ...Intentionally blank ...
Page 92: ...Intentionally blank ...
Page 96: ...Intentionally blank ...
Page 112: ...Intentionally blank ...
Page 120: ...Intentionally blank ...
Page 124: ...Intentionally blank ...
Page 138: ...Intentionally blank ...
Page 154: ...Intentionally blank ...
Page 168: ...Intentionally blank ...
Page 180: ...Intentionally blank ...
Page 182: ...Maintenance 2728 1 A1 Winterthur Gas Diesel Ltd 2 5 6 Lift housing from the valve spindle 4 ...
Page 186: ...Intentionally blank ...
Page 190: ......
Page 204: ...Intentionally blank ...
Page 211: ...Intentionally blank ...
Page 216: ...Intentionally blank ...
Page 224: ...Intentionally blank ...
Page 228: ......
Page 229: ...Intentionally blank ...
Page 264: ...Intentionally blank ...
Page 270: ...Intentionally blank ...
Page 280: ...Intentionally blank ...
Page 294: ...Intentionally blank ...
Page 298: ...Intentionally blank ...
Page 302: ...Intentionally blank ...
Page 318: ...Intentionally blank ...
Page 328: ...Intentionally blank ...
Page 344: ...Intentionally blank ...
Page 368: ...Intentionally blank ...
Page 374: ...Intentionally blank ...
Page 380: ...Intentionally blank ...
Page 396: ...Intentionally blank ...
Page 407: ...Intentionally blank ...
Page 426: ...Intentionally blank ...
Page 442: ...Intentionally blank ...
Page 444: ...Intentionally blank ...