Maintenance
3326
−
2/A1
Winterthur Gas & Diesel Ltd.
Crosshead
Crosshead Pin
−
Removal and Installation
Tools:
3 Manual ratchet (WLL 800 kg) (H1, H4, H5)
94016
2 Supporting devices
94322
2 Manual ratchets (WLL 500 kg) (H2, H3)
94016F
1 Lifting plate
94324
1 Spur-geared chain block (WLL 1000 kg) (H6) 94017C
1 Supporting device
94332
1 Link
94321
2 Lifting tools
94337
2 Eye bolts (EB1)
94045
−
M16 1 Shackle (WLL 8500 kg)
94572G
2 Eye bolts (EB2)
94045-M24
2 Shackles (WLL 1000 kg)
94572H
1 Deviation pipe
94117B
2 Shackles (WLL 2000 kg)
94279I
1 Platform element
94143
1 Platform element
94144
1 Lifting tool
94333
1.
Preparation
WARNING
Injury Hazard: Before you
operate the turning gear,
make sure that no
personnel are near the
flywheel, or in the engine.
1) Read the data in
General
Guidelines for Lifting Tools.
2) Operate the turning gear to move the
crank of the related cylinder to BDC.
3) Keep the turning gear engaged to
prevent an accidental engine start.
4) Install the platform elements(94143 and
.
5) Disconnect the toggle lever (1) from the
crosshead pin. Hold the toggle lever in
the position shown with a rope.
6) Remove the round nuts from the elastic
studs on the connecting rod, refer to
.
7) Remove the top bearing cover, refer to
.
8) Make sure that the tools (94133) are
installed on the piston rod foot (2)
9) Put protection on the oil inlets of the
crosshead pin to prevent damage and
contamination.
2017
I
1
94144
94143
WCH00620
1
Fig. 1
I
2
94333
WCH00558
Summary of Contents for X35-B
Page 12: ...Intentionally blank ...
Page 14: ...Intentionally blank ...
Page 16: ...Intentionally blank ...
Page 34: ...Intentionally blank ...
Page 58: ...Intentionally blank ...
Page 60: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 2 6 WCH03791 2017 ...
Page 61: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 3 6 WCH03791 2017 ...
Page 62: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 4 6 WCH03791 2017 ...
Page 63: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 5 6 WCH03791 2017 ...
Page 64: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 6 6 WCH03791 2017 ...
Page 68: ...Intentionally blank ...
Page 72: ...Intentionally blank ...
Page 82: ...Intentionally blank ...
Page 85: ...Intentionally blank ...
Page 92: ...Intentionally blank ...
Page 96: ...Intentionally blank ...
Page 112: ...Intentionally blank ...
Page 120: ...Intentionally blank ...
Page 124: ...Intentionally blank ...
Page 138: ...Intentionally blank ...
Page 154: ...Intentionally blank ...
Page 168: ...Intentionally blank ...
Page 180: ...Intentionally blank ...
Page 182: ...Maintenance 2728 1 A1 Winterthur Gas Diesel Ltd 2 5 6 Lift housing from the valve spindle 4 ...
Page 186: ...Intentionally blank ...
Page 190: ......
Page 204: ...Intentionally blank ...
Page 211: ...Intentionally blank ...
Page 216: ...Intentionally blank ...
Page 224: ...Intentionally blank ...
Page 228: ......
Page 229: ...Intentionally blank ...
Page 264: ...Intentionally blank ...
Page 270: ...Intentionally blank ...
Page 280: ...Intentionally blank ...
Page 294: ...Intentionally blank ...
Page 298: ...Intentionally blank ...
Page 302: ...Intentionally blank ...
Page 318: ...Intentionally blank ...
Page 328: ...Intentionally blank ...
Page 344: ...Intentionally blank ...
Page 368: ...Intentionally blank ...
Page 374: ...Intentionally blank ...
Page 380: ...Intentionally blank ...
Page 396: ...Intentionally blank ...
Page 407: ...Intentionally blank ...
Page 426: ...Intentionally blank ...
Page 442: ...Intentionally blank ...
Page 444: ...Intentionally blank ...