June 11, 2015, 715004752 Rev. A
Page 27
2
Installing the Detector
The detector requires connections to electrical power and to sample and waste
lines to operate in any standard laboratory environment. This chapter describes
how to install the detector, and connect it to the electrical supplies and to other
equipment in an HPLC system.
2.1 Before you begin
Requirement:
To install the 2489 UV/Vis detector, you should know how, in
general, to set up and operate laboratory instruments and computer-controlled
devices and also how to handle solvents.
Before installing the detector, ensure that
•
the required components are present.
•
none of the shipping containers or unpacked items are damaged.
2.2 Unpacking and inspecting
The detector is packed and shipped in one carton, which contains the following items:
•
2489 UV/Vis detector startup kit
•
Power cord
2.2.1 Unpacking the detector
To unpack the detector:
1. Unpack the contents of the shipping carton. As you unpack the carton, check
the contents to make sure you have received all items.
2. Check the contents of the startup kit.
3. Save the shipping carton for future transport or shipment.
Warning:
To avoid injury, Waters recommends that two people lift the 2489
UV/Vis detector.
Summary of Contents for 2489
Page 2: ...June 11 2015 715004752 Rev A Page ii...
Page 8: ...June 11 2015 715004752 Rev A Page viii...
Page 14: ...June 11 2015 715004752 Rev A Page xiv...
Page 46: ...June 11 2015 715004752 Rev A Page 46...
Page 124: ...June 11 2015 715004752 Rev A Page 124...