Unit Shutdown Procedures
CAUTION:
Compressor Damage!
To prevent damage to the compressor, be sure that all refrigerant
valves are open before starting the unit.
2.
Check the oil separator oil level. See Paragraph
"Oil Separator Level
Check" on Page 139
.
3.
Fill the evaporator and condenser water circuits. Refer to Table
1
for evap-
orator and condenser liquid capacities. Vent the system while it is being
filled. Open the vent on the top of the evaporator and condenser during
filling and close when filling is completed.
Proper Water Treatment!
The use of untreated or improperly treated water in a CenTraVac
may result in scaling, erosion, corrosion, algae or slime. It is
recommended that the services of a qualified water treatment
specialist be engaged to determine what water treatment, if any,
is required. Trane assumes no responsibility for equipment
failures which result from untreated or improperly treated water,
or saline or brackish water.
4.
Close the fused-disconnect switches that provides power to the chilled
water pump and the condenser water pump.
5.
Start both the evaporator and condenser water pumps and, while water
is circulating, inspect all piping for leakage. Make any necessary repairs
before starting the unit.
6.
While the water is circulating, adjust the water flows and check the water
pressure drops through the evaporator and the condenser. Refer to
“Water System Flow Rates” and “Water System Pressure Drop”.
7.
Adjust the flow switch on the evaporator piping and condenser piping (if
installed) for proper operation.
8.
Stop both water pumps. The unit is now ready for start-up as described in
“Start-Up Procedures”.
Summary of Contents for R Series
Page 17: ...RLC SVX07A EN 17 Installation Mechanical Figure 2 Rigging and Lifting for RTWA Units ...
Page 22: ...22 RLC SVX07A EN Installation Mechanical Figure 7 Rigging and Lifting for RTUA Units ...
Page 25: ...RLC SVX07A EN 25 Installation Mechanical Figure 10 Rigging and Lifting for RTCA Condenser ...
Page 69: ...RLC SVX07A EN 69 Installation Electrical Figure 28 Interconnecting Wiring from RTUA to RTCA ...
Page 129: ...RLC SVX07A EN 129 Start Up Procedures Figure 41 RTWA Unit Sequence of Operation ...
Page 130: ...130 RLC SVX07A EN Start Up Procedures Figure 42 RTUA Unit Sequence of Operation ...
Page 154: ...154 RLC SVX07A EN Diagnostics ...
Page 156: ...156 RLC SVX07A EN 3332 ...
Page 158: ...158 RLC SVX07A EN 3333 ...
Page 160: ...160 RLC SVX07A EN 3334 ...
Page 162: ...162 RLC SVX07A EN 3335 ...
Page 164: ...164 RLC SVX07A EN 3336 ...
Page 166: ...166 RLC SVX07A EN 5119 ...
Page 168: ...168 RLC SVX07A EN 5143 ...
Page 170: ...170 RLC SVX07A EN 5144 ...
Page 172: ...172 RLC SVX07A EN 5145 ...
Page 174: ...174 RLC SVX07A EN 5146 ...
Page 176: ...176 RLC SVX07A EN 6008 ...
Page 178: ...178 RLC SVX07A EN 6009 ...
Page 180: ...180 RLC SVX07A EN 5147 ...
Page 182: ...182 RLC SVX07A EN 6526 ...
Page 184: ...184 RLC SVX07A EN 5150 ...
Page 186: ...186 RLC SVX07A EN 6010 ...