42
RLC-SVX07A-EN
Installation - Mechanical
coupling and tighten securely by turning the hex nut, on the fitting body
only.
CAUTION
Equipment Damage!
Do not tighten the clamping nut at this time. This will prevent
proper sensor insertion.
3.
Insert the sensor into the compression fitting (through the clamping nut)
until the plastic coating on the sensor contacts the top of the clamping
nut.
4.
Use a wrench to carefully tighten the clamping nut until the sensor can
no longer be turned by hand.
5.
Scribe a reference line can the clamping nut at the “six o'clock” position.
Then, while observing the reference point, tighten the nut 1-1/4 additional
turns.
Refrigerant Relief Valve Venting
Condenser Pressure Relief Valve Venting (for RTWA units only)
All RTWA units utilize a refrigerant-pressure relief valve for each circuit which
must be vented to the outdoor atmosphere. The valves are located at the top
of the condenser. When facing the control panel, Circuit #1 relief valve is
approximately 5" left of center and Circuit #2 relief valve is approximately 5"
right of center. Relief valve connections are 5/8” flare. See Figure
21
and
Table
5
. Refer to local codes for relief valve vent line sizing requirements.
NOTE:
Vent line length must not exceed code recommendations. If the line
length will exceed code recommendations for the outlet size of the valve,
install a vent line of the next larger pipe size.
Figure 22
Water Temperature Sensor Installation
&RPSUHVVLRQ
&ODPSLQJ1XW
)LWWLQJ%RG\
137[/J&RXSOLQJ
Fitting
Summary of Contents for R Series
Page 17: ...RLC SVX07A EN 17 Installation Mechanical Figure 2 Rigging and Lifting for RTWA Units ...
Page 22: ...22 RLC SVX07A EN Installation Mechanical Figure 7 Rigging and Lifting for RTUA Units ...
Page 25: ...RLC SVX07A EN 25 Installation Mechanical Figure 10 Rigging and Lifting for RTCA Condenser ...
Page 69: ...RLC SVX07A EN 69 Installation Electrical Figure 28 Interconnecting Wiring from RTUA to RTCA ...
Page 129: ...RLC SVX07A EN 129 Start Up Procedures Figure 41 RTWA Unit Sequence of Operation ...
Page 130: ...130 RLC SVX07A EN Start Up Procedures Figure 42 RTUA Unit Sequence of Operation ...
Page 154: ...154 RLC SVX07A EN Diagnostics ...
Page 156: ...156 RLC SVX07A EN 3332 ...
Page 158: ...158 RLC SVX07A EN 3333 ...
Page 160: ...160 RLC SVX07A EN 3334 ...
Page 162: ...162 RLC SVX07A EN 3335 ...
Page 164: ...164 RLC SVX07A EN 3336 ...
Page 166: ...166 RLC SVX07A EN 5119 ...
Page 168: ...168 RLC SVX07A EN 5143 ...
Page 170: ...170 RLC SVX07A EN 5144 ...
Page 172: ...172 RLC SVX07A EN 5145 ...
Page 174: ...174 RLC SVX07A EN 5146 ...
Page 176: ...176 RLC SVX07A EN 6008 ...
Page 178: ...178 RLC SVX07A EN 6009 ...
Page 180: ...180 RLC SVX07A EN 5147 ...
Page 182: ...182 RLC SVX07A EN 6526 ...
Page 184: ...184 RLC SVX07A EN 5150 ...
Page 186: ...186 RLC SVX07A EN 6010 ...