RLC-SVX07A-EN
85
Operating Principles
Refrigeration (Cooling) Cycle
RTWA Cycle Description
Figure 35
represents the refrigeration system and control components of an
RTWA. Vaporized refrigerant leaves the evaporator and is drawn into the
compressor. Here it is compressed and leaves the compressor as a mixture
of hot gas and oil (which was injected during the compression cycle).
The mixture enters the oil separator at the in/out cap. The separated oil flows
to the bottom of the separator, while the refrigerant gas flows out the top and
passes on to the tubes in the condenser. Water flows through the copper
tubes in the condenser, which removes the heat from the refrigerant and
condenses it.
The condensed refrigerant passes through the electronic expansion valve and
into the tubes of the evaporator. As the refrigerant vaporizes, it cools the
system water that surrounds the tubes in the evaporator.
Figure 36
RTUA with RTCA Refrigeration System and Control Components
7
3
1
14
13
12
8
RTCA
Condenser
Evaporator
5
4
2
6
24
23
22
21
19
9
18
16
15
17
20
11
10
1.
Discharge Service Valve
10.
Liquid Line Service Valve
19.
Temperature Responsive Valve
2.
Oil Separator
(Backseat Port Upstream)
20.
Entering Water Connection
3.
1/4” Angle Valve
11.
Filter/Dryer
21.
Evaporator Entering Water
4.
Oil Cooler (if “V” is in 17th digit
12.
Sight Glass
Temperature Sensor
of Model #)
13.
Schrader Valve
22.
Relief Valve
5.
Oil Line Service Valve
14.
Electronic Expansion Valve
23.
Suction Service Valve
6.
Oil Temperature Sensor
15.
1/4” Angle Valve
24.
Compressor Suction Refrigerant
7.
Condenser
16.
Saturated Condenser
Temperature Sensor
8.
Saturated Condenser
Refrigerant Temperature Sensor
25.
Low Pressure Switch
Refrigerant Temperature Sensor
17.
Leaving Water Connection
9.
Solenoid Valve
18.
Evaporator Leaving Water
Temperature Sensor
NOTE:
- - -
Field Installed Piping
_____
Factory Installed Piping
Summary of Contents for R Series
Page 17: ...RLC SVX07A EN 17 Installation Mechanical Figure 2 Rigging and Lifting for RTWA Units ...
Page 22: ...22 RLC SVX07A EN Installation Mechanical Figure 7 Rigging and Lifting for RTUA Units ...
Page 25: ...RLC SVX07A EN 25 Installation Mechanical Figure 10 Rigging and Lifting for RTCA Condenser ...
Page 69: ...RLC SVX07A EN 69 Installation Electrical Figure 28 Interconnecting Wiring from RTUA to RTCA ...
Page 129: ...RLC SVX07A EN 129 Start Up Procedures Figure 41 RTWA Unit Sequence of Operation ...
Page 130: ...130 RLC SVX07A EN Start Up Procedures Figure 42 RTUA Unit Sequence of Operation ...
Page 154: ...154 RLC SVX07A EN Diagnostics ...
Page 156: ...156 RLC SVX07A EN 3332 ...
Page 158: ...158 RLC SVX07A EN 3333 ...
Page 160: ...160 RLC SVX07A EN 3334 ...
Page 162: ...162 RLC SVX07A EN 3335 ...
Page 164: ...164 RLC SVX07A EN 3336 ...
Page 166: ...166 RLC SVX07A EN 5119 ...
Page 168: ...168 RLC SVX07A EN 5143 ...
Page 170: ...170 RLC SVX07A EN 5144 ...
Page 172: ...172 RLC SVX07A EN 5145 ...
Page 174: ...174 RLC SVX07A EN 5146 ...
Page 176: ...176 RLC SVX07A EN 6008 ...
Page 178: ...178 RLC SVX07A EN 6009 ...
Page 180: ...180 RLC SVX07A EN 5147 ...
Page 182: ...182 RLC SVX07A EN 6526 ...
Page 184: ...184 RLC SVX07A EN 5150 ...
Page 186: ...186 RLC SVX07A EN 6010 ...