RLC-SVX07A-EN
141
Maintenance
WARNING
Components Under High Pressure!
Failure to relieve pressure before removing filter retaining bolt
could result in death or serious injury
5.
Remove the seven bolts on the oil filter cover. A pan may be necessary to
catch any oil that is released after the cover is loosened.
NOTE:
Observe the placement of the copper gasket under one bolt head.
6.
Remove the cover and oil filter element.
7.
Install the new filter element.
8.
Coat the new cover gasket with refrigerant oil.
9.
Install the cover plate and cover plate gasket.
10.
Install a new copper gasket under the bolt head that had one at time of
removal. Replace all other bolts and tighten to 150 ft.lbs.
11.
Energize the three solenoid valves on the compressor by jumpering the
proper terminals at the UCM.
12.
Evacuate to 400 microns from the three ports in Step 2 and perform a
rise test.
13.
De-energize the three solenoid valves in Step 11.
14.
Open the manual oil shutoff valve that was closed in Step 3.
Figure 45
Oil Filter Change
6XFWLRQ
6HUYLFH
9DOYH
0DQXDO2LO6KXWRII9DOYH
2LO)LOWHU&RYHU
2LO)LOWHU&RYHU3ODWH
6FKUDGHU9DOYH
8SVWUHDPRI2LO)LOWHU(OHPHQW
&RSSHUJDVNHW
XQGHUWKLVEROWKHDG
'LVFDUJH
6HUYLFH
9DOYH
&RPSUHVVRU2LO6XSSO\
6FKUDGHU9DOYH'RZQVWUHDP
RI2LO)LOWHU(OHPHQW
Summary of Contents for R Series
Page 17: ...RLC SVX07A EN 17 Installation Mechanical Figure 2 Rigging and Lifting for RTWA Units ...
Page 22: ...22 RLC SVX07A EN Installation Mechanical Figure 7 Rigging and Lifting for RTUA Units ...
Page 25: ...RLC SVX07A EN 25 Installation Mechanical Figure 10 Rigging and Lifting for RTCA Condenser ...
Page 69: ...RLC SVX07A EN 69 Installation Electrical Figure 28 Interconnecting Wiring from RTUA to RTCA ...
Page 129: ...RLC SVX07A EN 129 Start Up Procedures Figure 41 RTWA Unit Sequence of Operation ...
Page 130: ...130 RLC SVX07A EN Start Up Procedures Figure 42 RTUA Unit Sequence of Operation ...
Page 154: ...154 RLC SVX07A EN Diagnostics ...
Page 156: ...156 RLC SVX07A EN 3332 ...
Page 158: ...158 RLC SVX07A EN 3333 ...
Page 160: ...160 RLC SVX07A EN 3334 ...
Page 162: ...162 RLC SVX07A EN 3335 ...
Page 164: ...164 RLC SVX07A EN 3336 ...
Page 166: ...166 RLC SVX07A EN 5119 ...
Page 168: ...168 RLC SVX07A EN 5143 ...
Page 170: ...170 RLC SVX07A EN 5144 ...
Page 172: ...172 RLC SVX07A EN 5145 ...
Page 174: ...174 RLC SVX07A EN 5146 ...
Page 176: ...176 RLC SVX07A EN 6008 ...
Page 178: ...178 RLC SVX07A EN 6009 ...
Page 180: ...180 RLC SVX07A EN 5147 ...
Page 182: ...182 RLC SVX07A EN 6526 ...
Page 184: ...184 RLC SVX07A EN 5150 ...
Page 186: ...186 RLC SVX07A EN 6010 ...