)
)
OIAGNOSllCS
-
SUPPLEMENTAL RESTRAINT SYSTEM
DTC
80110/43
Short in Side Squib (RH) Circuit
CIRCUIT DESCRIPTION
The side squib (RH) circuit consists of the alrbag sensor assembly and side
airbag assembly
(AH).
It causes the SRS to deploy when the SRS deployment conditions are satisfied.
For details of the function of each component, see OPERATION on page R$-2.
OTC
80110/43
is recorded when a short Is detected in the side squib (RH) circuit.
OTC No.
DTC
Detecting Condition
Trouble Area
•
Sho
rt
circuit
betweefl FA+
wire harness and
FA-
wire
•Side airbag assembly (RH)
harness of squib
80110/43
•
Side
squib (RH)
malfunction
•
Airbag sensor assembly
•AI!bag
sensor
assembly malfunction
•
Wire
harness
WIRING DIAGRAM
Airbag Sensor Assembly
s;de Squ;b
(RH)
Y R
SFA+
Y-G
SFA-
Dl-369
,�,
Summary of Contents for ZZT230 series
Page 1: ......
Page 49: ......
Page 59: ......
Page 60: ...MAINTENANCE EQUIPMENT PP 1 PREPARATION MAINTENANCE I Brakehose...
Page 66: ...EMISSION CONTROL EQUIPMENT PREP ARATION EMISSION CONTROL PP 7...
Page 71: ...PP 12 RECOMMENDED TOOLS PREPARATION COOLING TOYOTA Eledrieal Tester...
Page 75: ...PP 16 PREPARA 11QN LUBRICATION EQUIPMENT S g edge...
Page 79: ...PP 20 EQUIPMENT ISparkplugcleaner PREPARATION IGNITION...
Page 81: ...PP 22 RECOMMENDED TOOLS PREPARATION ST ARTING 09082 00040 TOVOTA Electrical Tester...
Page 84: ...PP 25 PREPARAnON CHARGING RECOMMENDED TOOLS 09082 00040 TOYOTAElectrical Tester...
Page 88: ...PP 29 PREPARAnON CLUTCH EQUIPMENT 1 j...
Page 119: ...PP 60 PREPARATION SUSPENSIONAND AXLE EQUIPMENT...
Page 130: ...PP 71 PREPARATION STEERING EQUIPMENT PSvanepump PSvanepump _ PS PSvane pump _ PSvanepump r...
Page 142: ...PP 83 PREPARATION BODY LUBRICANT IUPJf S nem Classification...
Page 149: ...MEMO _ _ _...
Page 151: ......
Page 211: ......
Page 813: ...MEMO...
Page 814: ...ID 1 ALPHABETICAL INDEX...
Page 820: ...MEMO...
Page 821: ...MEMO llil...