lll-198
TRANSAXLE
INSPECTION PROCEDURE
N
1
Check resistance between terminals NC+ and Nc- of ECM.
PREPARATION:
Disconnect the connector from ECM.
CHECK:
Check resistance between terminals NC+ and Nc- of ECM.
OK: Resistance: 620
± 60 n
Check and replace the ECM
(See page IN-00).
2
Check NC
revolution speed sensor.
""'
"
PREPARATION:
Remove the NC revolution speed sensor from transaxle.
CHECK:
(a) Measure resistance between terminals 1 and
2
of speed
sensor.
(b) Check voltage between terminals
1
and
2
of the speed
sensor when a magnet is put close to the front end of the
speed sensor then taken away quickly.
OK:
HINT:
(a) Resistance: 620
± 60
!l
at 20 'C (68 'F)
(b) Voltage Is generated Intermittently.
The voltage generated is extremely low.
Replace the NC revolution speed sensor.
Check and the harness and connector
between
and
NC revolution speed sen·
sor (See page
IN-00).
Summary of Contents for ZZT230 series
Page 1: ......
Page 49: ......
Page 59: ......
Page 60: ...MAINTENANCE EQUIPMENT PP 1 PREPARATION MAINTENANCE I Brakehose...
Page 66: ...EMISSION CONTROL EQUIPMENT PREP ARATION EMISSION CONTROL PP 7...
Page 71: ...PP 12 RECOMMENDED TOOLS PREPARATION COOLING TOYOTA Eledrieal Tester...
Page 75: ...PP 16 PREPARA 11QN LUBRICATION EQUIPMENT S g edge...
Page 79: ...PP 20 EQUIPMENT ISparkplugcleaner PREPARATION IGNITION...
Page 81: ...PP 22 RECOMMENDED TOOLS PREPARATION ST ARTING 09082 00040 TOVOTA Electrical Tester...
Page 84: ...PP 25 PREPARAnON CHARGING RECOMMENDED TOOLS 09082 00040 TOYOTAElectrical Tester...
Page 88: ...PP 29 PREPARAnON CLUTCH EQUIPMENT 1 j...
Page 119: ...PP 60 PREPARATION SUSPENSIONAND AXLE EQUIPMENT...
Page 130: ...PP 71 PREPARATION STEERING EQUIPMENT PSvanepump PSvanepump _ PS PSvane pump _ PSvanepump r...
Page 142: ...PP 83 PREPARATION BODY LUBRICANT IUPJf S nem Classification...
Page 149: ...MEMO _ _ _...
Page 151: ......
Page 211: ......
Page 813: ...MEMO...
Page 814: ...ID 1 ALPHABETICAL INDEX...
Page 820: ...MEMO...
Page 821: ...MEMO llil...