Connecling
rod
)
SPECIACATIONS
-
ENGINE
MECHANICAL
122-FE:
Tlwust -
Connecting
rod thickness
STD
Maximum
0.160- 0.342 mm (0.0063 -O.Q135 1n.)
0.342
mm
(0.0135 in.)
19.788 - 1 9.840mm (0.7791 -0.7611 in.)
Connecting
rod
bearing
center
wall
thickness
--
Connecting
rod oil
clearance
Mad<l
Mark2
M""3
STD
Maximum
1.486- 1.490 mm (0.0585 -0.0587 in.)
1.490- 1.494 mm (0.0587 -0.0588 in.)
1.494- 1.498 mm (0.0588 -0.0590 io.)
0.028- 0.060 mm (0.0011 - 0.0024 in.)
0.08 mm (0.0031 io.)
Rodoul-of-aljgnment
Maximumper/100 mm (3.94 in.) 0.05 mm (0.0020 in.)
Rod twist
Maximumper/100 mm (3.94 in.) 0.05 mm (0.0020 in.)
Bushing
Inside
€1ameter
Piston
pin ciameter
Bushing oil
clearance
STD
20.012-20.021 mm (0.7879- 0.7882 in.)
20.004-20.013 mm (0.7876 -0.7879 in.)
0.005- 0.ot1 mm (0.0002 - 0.0004 in.)
0.05 mm (0.0020 in.)
Connecting
rod bolt diameter
222-GE:
....... _
Collnecting
rod thk:kn!'lh
Maximum
at
tension jXIrtion
STO
6.6-6.7 mm (0.260 - 0.264 rn.)
Minimum 8.4 mm (0.252 in.)
STD
0.160- 0.342 mm (0.0063 -0.0135 \n.)
Maximum 0.342 mm (0.0135 in.)
19.788 - 1 9.840
mm
(0.7791 -0.7811 in.)
Connecting
rod
bearing
center
wall
thickness
-
-
Cor•'IBCting
rod
oil clearance
Mil111: 1 1.482- 1 .486 mm (0.0583-0.0585 1n.)
Mark 2 1.486- 1.490 mm (0.0585-0.0587 in.)
Mark3 1.490- 1.494 mm (0.0587-0.0588 in.)
STO
0.028-0.052 mm (0.0011 -0.0020 in.)
Rod
out-of-alignment
""" '""'
Maximum 0.08 mm (0.0031 in.)
Maximum per/100 mm (3.94 in.) 0.05 mm (0.0020 in.)
Maximum per/100 mm {3.94 in.) 0.05 mm (0.0020 ln.)
Bushing insidedameter
Piston pin
diameter
Bushing
oil clearance
Connecting
rod bot damelet
Connecting
rod
20.011 -20.023 mm (0.7878 -0.7883 in.)
Piston 20.013 -20.025 mm (0.7879 -0.7884 in.)
20.004 -20.016 mm {0.7876- 0.7880 in.)
STD
Piston
x
PistOn pin 0.005 - 0.013 mm (0.0002-0.0005 in.)
Piston pin
ll
Connecting
rod
0.005 -0.009 mm (0.0002 - 0.0004 in.)
Maximum 0.05 mm (0.0020 in.)
at
tension portioo
STO
6.6- 6.7 mm (0.260- 0.264 in.)
Minimum 6.4 mm (0.252 in.)
SS-11
Summary of Contents for ZZT230 series
Page 1: ......
Page 49: ......
Page 59: ......
Page 60: ...MAINTENANCE EQUIPMENT PP 1 PREPARATION MAINTENANCE I Brakehose...
Page 66: ...EMISSION CONTROL EQUIPMENT PREP ARATION EMISSION CONTROL PP 7...
Page 71: ...PP 12 RECOMMENDED TOOLS PREPARATION COOLING TOYOTA Eledrieal Tester...
Page 75: ...PP 16 PREPARA 11QN LUBRICATION EQUIPMENT S g edge...
Page 79: ...PP 20 EQUIPMENT ISparkplugcleaner PREPARATION IGNITION...
Page 81: ...PP 22 RECOMMENDED TOOLS PREPARATION ST ARTING 09082 00040 TOVOTA Electrical Tester...
Page 84: ...PP 25 PREPARAnON CHARGING RECOMMENDED TOOLS 09082 00040 TOYOTAElectrical Tester...
Page 88: ...PP 29 PREPARAnON CLUTCH EQUIPMENT 1 j...
Page 119: ...PP 60 PREPARATION SUSPENSIONAND AXLE EQUIPMENT...
Page 130: ...PP 71 PREPARATION STEERING EQUIPMENT PSvanepump PSvanepump _ PS PSvane pump _ PSvanepump r...
Page 142: ...PP 83 PREPARATION BODY LUBRICANT IUPJf S nem Classification...
Page 149: ...MEMO _ _ _...
Page 151: ......
Page 211: ......
Page 813: ...MEMO...
Page 814: ...ID 1 ALPHABETICAL INDEX...
Page 820: ...MEMO...
Page 821: ...MEMO llil...