)
)
01-513
DIAGNOSTICS
CRUISE CONTROL SYSTEM
INSPECTION PROCEDURE
1
Check voltage
between termlnai iDL of cruise control ECU connector and body
ground.
er
PREPARATION:
(a)
Remove
the
ECU
with connector still connected.
(b) Disconnect the ECM
connector.
(c)
Turn
i
gni
t
i
o
n
switch
ON.
CHECK:
Measure voltage between
terminai iDL of
ECU
connector and
body ground when the
throttle valve is fully closed and fully
opened.
OK:
Throttle valve position
Voltage
(+)
Fully opened
1 0 - 1 4
v
''""
closed
Betow 2 V
""'u
100112
Pr
ocee
d
to next circuit inspection shown
problem symptom table
(See
page Dl-494).
2
Check harness
and
connector
between ECM and throttle position sensor (See
page IN-30).
G
Repair or
replace harness or connector.
3
Check throttle position sensor circuit
(See page Dl-38).
G
Replace throttle position sensor.
In
Summary of Contents for ZZT230 series
Page 1: ......
Page 49: ......
Page 59: ......
Page 60: ...MAINTENANCE EQUIPMENT PP 1 PREPARATION MAINTENANCE I Brakehose...
Page 66: ...EMISSION CONTROL EQUIPMENT PREP ARATION EMISSION CONTROL PP 7...
Page 71: ...PP 12 RECOMMENDED TOOLS PREPARATION COOLING TOYOTA Eledrieal Tester...
Page 75: ...PP 16 PREPARA 11QN LUBRICATION EQUIPMENT S g edge...
Page 79: ...PP 20 EQUIPMENT ISparkplugcleaner PREPARATION IGNITION...
Page 81: ...PP 22 RECOMMENDED TOOLS PREPARATION ST ARTING 09082 00040 TOVOTA Electrical Tester...
Page 84: ...PP 25 PREPARAnON CHARGING RECOMMENDED TOOLS 09082 00040 TOYOTAElectrical Tester...
Page 88: ...PP 29 PREPARAnON CLUTCH EQUIPMENT 1 j...
Page 119: ...PP 60 PREPARATION SUSPENSIONAND AXLE EQUIPMENT...
Page 130: ...PP 71 PREPARATION STEERING EQUIPMENT PSvanepump PSvanepump _ PS PSvane pump _ PSvanepump r...
Page 142: ...PP 83 PREPARATION BODY LUBRICANT IUPJf S nem Classification...
Page 149: ...MEMO _ _ _...
Page 151: ......
Page 211: ......
Page 813: ...MEMO...
Page 814: ...ID 1 ALPHABETICAL INDEX...
Page 820: ...MEMO...
Page 821: ...MEMO llil...