)
01-201
DIAGNOSTICS
AUTOMATIC TRANSAXLE
INSPECTION PROCEDURE
1
Check shift solenoid valve SLT.
.. �
PREPARATION:
(a) Jack up the vehicle.
(b)
Remove the oil pan.
(c)
Disconnect the solenoid connector.
Check solenoid resistance:
CHECK:
Measure resistance between terminals
1
and 2 of solenoid con
nector.
OK:
Resistance: 5.0-5.6
Q
C
heck solenoid operation:
CHECK:
Connect positive (+) lead with an
8
- lOW
bulb to terminal l of
solenoid connector and negative (-) lead to terminal
2,
then
check the movement of the valve.
OK:
When battery positive voltage is applied.
When battery positive voltage is cui oft.
Valvemovasin
• •
..
direction
in Illustration al right
Valve moves in
direction
In lllustralion a! left.
R
ep
la
ce
shift
solenoid valve SLT.
2
Check harness and connector between
shift
solenoid valve SLT
and
ECM (See
page
IN-30).
Repair or replace harness or connector.
Replace ECM.
Summary of Contents for ZZT230 series
Page 1: ......
Page 49: ......
Page 59: ......
Page 60: ...MAINTENANCE EQUIPMENT PP 1 PREPARATION MAINTENANCE I Brakehose...
Page 66: ...EMISSION CONTROL EQUIPMENT PREP ARATION EMISSION CONTROL PP 7...
Page 71: ...PP 12 RECOMMENDED TOOLS PREPARATION COOLING TOYOTA Eledrieal Tester...
Page 75: ...PP 16 PREPARA 11QN LUBRICATION EQUIPMENT S g edge...
Page 79: ...PP 20 EQUIPMENT ISparkplugcleaner PREPARATION IGNITION...
Page 81: ...PP 22 RECOMMENDED TOOLS PREPARATION ST ARTING 09082 00040 TOVOTA Electrical Tester...
Page 84: ...PP 25 PREPARAnON CHARGING RECOMMENDED TOOLS 09082 00040 TOYOTAElectrical Tester...
Page 88: ...PP 29 PREPARAnON CLUTCH EQUIPMENT 1 j...
Page 119: ...PP 60 PREPARATION SUSPENSIONAND AXLE EQUIPMENT...
Page 130: ...PP 71 PREPARATION STEERING EQUIPMENT PSvanepump PSvanepump _ PS PSvane pump _ PSvanepump r...
Page 142: ...PP 83 PREPARATION BODY LUBRICANT IUPJf S nem Classification...
Page 149: ...MEMO _ _ _...
Page 151: ......
Page 211: ......
Page 813: ...MEMO...
Page 814: ...ID 1 ALPHABETICAL INDEX...
Page 820: ...MEMO...
Page 821: ...MEMO llil...