01-117
DIAGNOSTICS
-
ENGINE
)
Check
and replace
ECM
(See
page IN-30).
)
)
4
Check
for open and short In harness and connector in
IGT
signal circuit between
ECM and Ignition coil with Igniter (See page IN-30).
G
Repair or replace harness or connector.
5
Check
voltage between terminals
IGTI
-
4 of
ECM
connector and body ground.
IGT
IGF
5 VI
Division
PREPARATION:
Remove the ECM cover.
CHECK:
Measure voltage between terminals
IGT1
-
4
of the ECM con·
nectar and body ground when engine is cranked.
OK:
Voltage: More than 0.1 V and less than 4.5 V
Reference: INSPECTION USING OSCILLOSCOPE
During cranking or idling, check waveform between terminals
IGT1
-
4
and E
1
of the ECM connector.
HINT:
GND
Correct waveform appears as sohwn, with rectangle waves.
GND
G
Check and replace ECM (See page IN-30).
Summary of Contents for ZZT230 series
Page 1: ......
Page 49: ......
Page 59: ......
Page 60: ...MAINTENANCE EQUIPMENT PP 1 PREPARATION MAINTENANCE I Brakehose...
Page 66: ...EMISSION CONTROL EQUIPMENT PREP ARATION EMISSION CONTROL PP 7...
Page 71: ...PP 12 RECOMMENDED TOOLS PREPARATION COOLING TOYOTA Eledrieal Tester...
Page 75: ...PP 16 PREPARA 11QN LUBRICATION EQUIPMENT S g edge...
Page 79: ...PP 20 EQUIPMENT ISparkplugcleaner PREPARATION IGNITION...
Page 81: ...PP 22 RECOMMENDED TOOLS PREPARATION ST ARTING 09082 00040 TOVOTA Electrical Tester...
Page 84: ...PP 25 PREPARAnON CHARGING RECOMMENDED TOOLS 09082 00040 TOYOTAElectrical Tester...
Page 88: ...PP 29 PREPARAnON CLUTCH EQUIPMENT 1 j...
Page 119: ...PP 60 PREPARATION SUSPENSIONAND AXLE EQUIPMENT...
Page 130: ...PP 71 PREPARATION STEERING EQUIPMENT PSvanepump PSvanepump _ PS PSvane pump _ PSvanepump r...
Page 142: ...PP 83 PREPARATION BODY LUBRICANT IUPJf S nem Classification...
Page 149: ...MEMO _ _ _...
Page 151: ......
Page 211: ......
Page 813: ...MEMO...
Page 814: ...ID 1 ALPHABETICAL INDEX...
Page 820: ...MEMO...
Page 821: ...MEMO llil...