-
5
Check voltage between terminals VC and E2 of ECM connector.
ON
(+)
.....
-
PREPARATION:
(a)
Remove the ECM cover.
(b)
Turn ignition
switch
ON.
CHECK:
Measure voltage between terminals VC and E2 of the ECM
connector.
OK:
Voltage:
4.5- 5.5
V
G
Check and replace ECM (See page iN-30).
Check
tor open In
harness
end
c
o
n
nect
o
r
11&
- ECM
end sensor
(VC line}
(See
page IN-30}.
Summary of Contents for ZZT230 series
Page 1: ......
Page 49: ......
Page 59: ......
Page 60: ...MAINTENANCE EQUIPMENT PP 1 PREPARATION MAINTENANCE I Brakehose...
Page 66: ...EMISSION CONTROL EQUIPMENT PREP ARATION EMISSION CONTROL PP 7...
Page 71: ...PP 12 RECOMMENDED TOOLS PREPARATION COOLING TOYOTA Eledrieal Tester...
Page 75: ...PP 16 PREPARA 11QN LUBRICATION EQUIPMENT S g edge...
Page 79: ...PP 20 EQUIPMENT ISparkplugcleaner PREPARATION IGNITION...
Page 81: ...PP 22 RECOMMENDED TOOLS PREPARATION ST ARTING 09082 00040 TOVOTA Electrical Tester...
Page 84: ...PP 25 PREPARAnON CHARGING RECOMMENDED TOOLS 09082 00040 TOYOTAElectrical Tester...
Page 88: ...PP 29 PREPARAnON CLUTCH EQUIPMENT 1 j...
Page 119: ...PP 60 PREPARATION SUSPENSIONAND AXLE EQUIPMENT...
Page 130: ...PP 71 PREPARATION STEERING EQUIPMENT PSvanepump PSvanepump _ PS PSvane pump _ PSvanepump r...
Page 142: ...PP 83 PREPARATION BODY LUBRICANT IUPJf S nem Classification...
Page 149: ...MEMO _ _ _...
Page 151: ......
Page 211: ......
Page 813: ...MEMO...
Page 814: ...ID 1 ALPHABETICAL INDEX...
Page 820: ...MEMO...
Page 821: ...MEMO llil...