'
)
)
)
Dl-13
DIAGNOSTICS
-
ENGINE
Idling:
iNJECTOR
Fuel injection time for cylinder
No. t
lZZ-FE: 1.1 - 2.1 ms
2ZZ-GE: 0.8-2.0
ms
Intake
Air
Control Va
lv
e Duty Rallo
Idling:
lAC
DUTY
RATIO
Opening
ratio
rotary solenoid type lAC v
a
lv
e
1ZZ-FE:25-35%
2ZZ-GE:
22-35%
STARTER
SIG
Starter S"1gnal
Cranking: ON
C
T
P
SW
Closed
Throtlle Position Signal
Throttle fully closed:
ON
AJCSIG
AIC
Switch Signal
NCON:ON
PNPSIG
Park/Neutral
Position
SwitCh
Signal
P o r N position: ON
ELECTCL LOAD
SIG
Electrical load
Signal
Defogger SfW
ON: ON
STOP UOHT SW
Stop
light
Switch
Signal
Stop
l
i
g
h
t
switch
ON: ON
PS OIL PRESS
SW
Power
St
ee
ri
ng
Oil
PrKsure
Switch
Signal
Tum
steering
wheel:
ON
FCJDL
Fuel Cut Idle: Fuel
cut
wh&n throttle valve fiJiy
Fuel cut
ope
r
a
ti
ng
:
ON
closed,
during
deceleration
FC TAU
Fuel CUt TAU: Fuel
cut
during
very
light
load
fuel
cut
operating: ON
CVLMI , CYli2, CYLI3,CYLI4
Abnormal
revolution variation for each cylinder
IGNITION
Total
number
of
ig
n
iti
o
n for every 1 ,000 revolu-
0 - 2,000
rpm
tions
F
U
EL
P
U
M
P
Fuel
Pump
Signal
Idling: ON
AJC MAG CLUTCH
AJC switch signal
AlC ON: ON
EVAP (PURGE) VSV
EVAP VSV
signal
VSVoperating:
ON
VVT
C
T
R
L
VVT
control
signal
VVT
operating:
ON
INTAKE CTRL VSV
Intake control
VSV
signal
VSV operating:
ON
T
O
T
AL
FT
B
1
Total
Fuel
Trim
Bank 1: Average value for fuel
Idling:
0.8-
1.2 V
bim system of
bank 1
Heated
Oxygen Sensor
Lean Rich Bank 1, Sen-
02 LR8t,S1
sor 1
R
e
sponse
time for oxygen sensor
output
to Idling after wam1ing up:
0 - 1,000
ms&c.
switch
from
lean
to
rich
Heated
Oxygen Sensor Rich Lean Bank
1 , Sen-
02 Rl
81, 51
sor
1 Response time for
OltYQen
sensor output to Idling after
wanning
up:
0
- 1,000 msec.
switch
from rich to Jean
.
.
'": lfnocondit1ons are spec•fically stated for �ldl1ng•, 1t means the shift lever rs at N or
P
posttron, the
A/C
sw1tch
is
OFF
and all accessory switches are
OFF.
Summary of Contents for ZZT230 series
Page 1: ......
Page 49: ......
Page 59: ......
Page 60: ...MAINTENANCE EQUIPMENT PP 1 PREPARATION MAINTENANCE I Brakehose...
Page 66: ...EMISSION CONTROL EQUIPMENT PREP ARATION EMISSION CONTROL PP 7...
Page 71: ...PP 12 RECOMMENDED TOOLS PREPARATION COOLING TOYOTA Eledrieal Tester...
Page 75: ...PP 16 PREPARA 11QN LUBRICATION EQUIPMENT S g edge...
Page 79: ...PP 20 EQUIPMENT ISparkplugcleaner PREPARATION IGNITION...
Page 81: ...PP 22 RECOMMENDED TOOLS PREPARATION ST ARTING 09082 00040 TOVOTA Electrical Tester...
Page 84: ...PP 25 PREPARAnON CHARGING RECOMMENDED TOOLS 09082 00040 TOYOTAElectrical Tester...
Page 88: ...PP 29 PREPARAnON CLUTCH EQUIPMENT 1 j...
Page 119: ...PP 60 PREPARATION SUSPENSIONAND AXLE EQUIPMENT...
Page 130: ...PP 71 PREPARATION STEERING EQUIPMENT PSvanepump PSvanepump _ PS PSvane pump _ PSvanepump r...
Page 142: ...PP 83 PREPARATION BODY LUBRICANT IUPJf S nem Classification...
Page 149: ...MEMO _ _ _...
Page 151: ......
Page 211: ......
Page 813: ...MEMO...
Page 814: ...ID 1 ALPHABETICAL INDEX...
Page 820: ...MEMO...
Page 821: ...MEMO llil...