)
Dl-25
OJAGNOSTlCS
ENGINE
CHECK:
Read mass air
flow rate on the
080
II
scan tool or
TOYOTA
hand-held tester.
RESULT:
2
Mass air
flow rate
Type
I
0.0
Go to step 2.
Goto step 5.
Type
II
271.0 or more
Check
voltage of mass air flow meter power source.
PREPARATION:
{a)
Disconnect the mass air flow meter connector.
(b) Turn ignition switch
ON.
CHECK:
Measure voltage between terminal 4 of mass air flow meter con·
nectar and body ground.
OK:
Voltage:
9
-
14
V
L>
Check for open In harness and connector be
tween EFI main relay (Marking: EFI) and mass
air flow meter (See page IN-30).
3
Check
voltage between tennlnal
VG
of
ECM
connector and body ground.
PREPARATION:
(a)
Remove the
ECM
cover.
(b)
Start the engine.
CHECK:
Measure voltage between terminal
VG
of
ECM
and body
ground while engine is idling.
OK:
Voltage:
1.1
-
1.5
V (P
o
r N
po
sit
i
o
n
and AJC switch OFF)
Check and replace ECM (See page IN-30).
) c:J
Summary of Contents for ZZT230 series
Page 1: ......
Page 49: ......
Page 59: ......
Page 60: ...MAINTENANCE EQUIPMENT PP 1 PREPARATION MAINTENANCE I Brakehose...
Page 66: ...EMISSION CONTROL EQUIPMENT PREP ARATION EMISSION CONTROL PP 7...
Page 71: ...PP 12 RECOMMENDED TOOLS PREPARATION COOLING TOYOTA Eledrieal Tester...
Page 75: ...PP 16 PREPARA 11QN LUBRICATION EQUIPMENT S g edge...
Page 79: ...PP 20 EQUIPMENT ISparkplugcleaner PREPARATION IGNITION...
Page 81: ...PP 22 RECOMMENDED TOOLS PREPARATION ST ARTING 09082 00040 TOVOTA Electrical Tester...
Page 84: ...PP 25 PREPARAnON CHARGING RECOMMENDED TOOLS 09082 00040 TOYOTAElectrical Tester...
Page 88: ...PP 29 PREPARAnON CLUTCH EQUIPMENT 1 j...
Page 119: ...PP 60 PREPARATION SUSPENSIONAND AXLE EQUIPMENT...
Page 130: ...PP 71 PREPARATION STEERING EQUIPMENT PSvanepump PSvanepump _ PS PSvane pump _ PSvanepump r...
Page 142: ...PP 83 PREPARATION BODY LUBRICANT IUPJf S nem Classification...
Page 149: ...MEMO _ _ _...
Page 151: ......
Page 211: ......
Page 813: ...MEMO...
Page 814: ...ID 1 ALPHABETICAL INDEX...
Page 820: ...MEMO...
Page 821: ...MEMO llil...