
41
Operation Procedure
To resume solution delivery
Display
select switch
1)
Press the Display select switch.
Check
• The settings of the flow rate and the VTBI are correct.
Flow rate
VTBI
Start switch
Operation indicator (green flashing)
2)
Press the Start switch.
Notes
• The operation indicator flashes green.
• The volume delivered increases.
• The remaining time decreases.
Remaining time
Volume delivered